Active Harmonic Filter & Capacitor Bank
Product family: Detuned Power Factor Racks.
Flow: Metallized PP Film Caps → Dry PP Capacitor Roll & Zn → Detuning Copper Reactor Fit → Thyristor Switching Board → Cabinet Fan & Contactor Wire → 480V VAR Compensation Bench → Steel Mills & Heavy Plants
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Dry PP Capacitor Roll & Zn | 334 s | 25 min | 95% | 99.1% | 55 | 94 (1.71 d) | 72 |
| 2. Detuning Copper Reactor Fit | 383 s | 20 min | 93% | 98.4% | 33 | 83 (1.51 d) | 60 |
| 3. Thyristor Switching Board | 530 s | 18 min | 86% | 95.8% | 22 | 110 (2.00 d) | 38 |
| 4. Cabinet Fan & Contactor Wire | 393 s | 12 min | 93% | 97.6% | 14 | 61 (1.11 d) | 56 |
| 5. 480V VAR Compensation Bench | 314 s | 10 min | 96% | 99.0% | 11 | 44 (0.80 d) | 73 |
Key figures
- Takt time
- 491 s
- Lead time
- 8.60 d
- Value-added time
- 1,954 s
- Process cycle efficiency (PCE)
- 0.84%
- Rolled throughput yield (RTY)
- 90.3%
- Customer demand per day
- 55 units
- Line capacity per day
- 38 units
- Bottleneck
- Thyristor Switching Board
Reading the bottleneck
The bottleneck is "Thyristor Switching Board": it can process 38 units per day against a demand of 55 units, so it falls short of demand by 31.3%. Once downtime and scrap are counted, its cycle time grows from 530 s to 643 s, against a takt of 491 s. The largest loss at this step is equipment downtime (uptime 86%), about 86.3 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Switchgear, UPS & Power Systems: Switchgear, UPS & Power Systems
- 24kV SF6-Free Gas-Insulated Switchgear Bay
- Withdrawable 4000A Low-Voltage MCC Lineup
- 2.5MVA Cast-Resin Dry Distribution Transformer
- 350kW Liquid-Cooled EV Highway Fast Charger
- Modular 1MW Online Double-Conversion UPS
- Intelligent 42-Breaker Monitored Rack PDU
- 1500V Utility 250kW String Solar Inverter
- IEC-61850 Digital Substation Protection Relay
- 400kWh Grid Liquid-Cooled LFP Battery Rack
- 4000A Solenoid-Operated Automatic Transfer Switch
- Multi-Axis EtherCAT Industrial Servo Drive