4000A Solenoid-Operated Automatic Transfer Switch

Product family: Mission-Critical Hospital ATS.

Flow: Silver-Tungsten Contacts → Silver-Alloy Contact Brazing → Phenolic Arc Chute Stack → Fast Dual-Coil Transfer Mech → Microprocessor AMF Logic Wire → 200-Cycle Under-Load Bounce → Hospital & Data Center Generators

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 4000A Solenoid-Operated Automatic Transfer SwitchSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Silver-Tungsten Contacts → Silver-Alloy Contact Brazing (918 s) → Phenolic Arc Chute Stack (1,053 s) → Fast Dual-Coil Transfer Mech (1,458 s) → Microprocessor AMF Logic Wire (1,080 s) → 200-Cycle Under-Load Bounce (864 s) → Hospital & Data Center Generators.SUPPLIERSilver-TungstenContactsI1.70 d1Silver-AlloyContact BrazingC/T 918 sI1.50 d2Phenolic ArcChute StackC/T 1,053 sI2.00 d3Fast Dual-CoilTransfer MechC/T 1,458 sI1.10 d4MicroprocessorAMF Logic WireC/T 1,080 sI0.80 d5200-CycleUnder-Load BounceC/T 864 sI1.40 dCUSTOMERHospital & DataCenter…40 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Silver-Alloy Contact Brazing918 s25 min95%99.1%4068 (1.70 d)54
2. Phenolic Arc Chute Stack1,053 s20 min93%98.4%2460 (1.50 d)45
3. Fast Dual-Coil Transfer Mech1,458 s18 min86%95.8%1680 (2.00 d)29
4. Microprocessor AMF Logic Wire1,080 s12 min93%97.6%1044 (1.10 d)43
5. 200-Cycle Under-Load Bounce864 s10 min96%99.0%832 (0.80 d)56

Key figures

Takt time
1,350 s
Lead time
8.60 d
Value-added time
5,373 s
Process cycle efficiency (PCE)
1.2%
Rolled throughput yield (RTY)
90.3%
Customer demand per day
40 units
Line capacity per day
29 units
Bottleneck
Fast Dual-Coil Transfer Mech

Reading the bottleneck

The bottleneck is "Fast Dual-Coil Transfer Mech": it can process 29 units per day against a demand of 40 units, so it falls short of demand by 27.5%. Once downtime and scrap are counted, its cycle time grows from 1,458 s to 1,770 s, against a takt of 1,350 s. The largest loss at this step is equipment downtime (uptime 86%), about 237 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.