Multi-Axis EtherCAT Industrial Servo Drive

Product family: Regenerative CNC Servo Amps.

Flow: Al Extruded Heatsink → SMT Logic + Power Stack → Thermal Grease IGBT Torque → Sheet-Metal Chassis & Fan Fit → EtherCAT Node Address Flash → Closed-Loop Motor Load Run → Packaging & Robotics OEMs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Multi-Axis EtherCAT Industrial Servo DriveSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Al Extruded Heatsink → SMT Logic + Power Stack (97.0 s) → Thermal Grease IGBT Torque (111 s) → Sheet-Metal Chassis & Fan Fit (153 s) → EtherCAT Node Address Flash (114 s) → Closed-Loop Motor Load Run (91.0 s) → Packaging & Robotics OEMs.SUPPLIERAl ExtrudedHeatsinkI1.70 d1SMT Logic + PowerStackC/T 97.0 sI1.50 d2Thermal GreaseIGBT TorqueC/T 111 sI2.00 d3Sheet-MetalChassis & Fan FitC/T 153 sI1.10 d4EtherCAT NodeAddress FlashC/T 114 sI0.80 d5Closed-Loop MotorLoad RunC/T 91.0 sI1.40 dCUSTOMERPackaging &Robotics OEMs380 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. SMT Logic + Power Stack97.0 s25 min95%99.1%380646 (1.70 d)510
2. Thermal Grease IGBT Torque111 s20 min93%98.4%228570 (1.50 d)429
3. Sheet-Metal Chassis & Fan Fit153 s18 min86%95.8%152760 (2.00 d)276
4. EtherCAT Node Address Flash114 s12 min93%97.6%95418 (1.10 d)407
5. Closed-Loop Motor Load Run91.0 s10 min96%99.0%76304 (0.80 d)533

Key figures

Takt time
142 s
Lead time
8.51 d
Value-added time
566 s
Process cycle efficiency (PCE)
0.12%
Rolled throughput yield (RTY)
90.3%
Customer demand per day
380 units
Line capacity per day
276 units
Bottleneck
Sheet-Metal Chassis & Fan Fit

Reading the bottleneck

The bottleneck is "Sheet-Metal Chassis & Fan Fit": it can process 276 units per day against a demand of 380 units, so it falls short of demand by 27.3%. Once downtime and scrap are counted, its cycle time grows from 153 s to 186 s, against a takt of 142 s. The largest loss at this step is equipment downtime (uptime 86%), about 24.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.