1500V Utility 250kW String Solar Inverter

Product family: Outdoor IP66 String Inverters.

Flow: Power Semiconductor & Ferrite Suppliers → Die-Cast Al Box & Fin Gasket → DC-Link Cap & IGBT Base → DC String MPPT Card Plug → Salt Mist Seal & Fan Mount → Dynamic Grid Fault Ride Test → Utility Solar PV EPCs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 1500V Utility 250kW String Solar InverterSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Power Semiconductor & Ferrite Suppliers → Die-Cast Al Box & Fin Gasket (565 s) → DC-Link Cap & IGBT Base (648 s) → DC String MPPT Card Plug (897 s) → Salt Mist Seal & Fan Mount (665 s) → Dynamic Grid Fault Ride Test (532 s) → Utility Solar PV EPCs.SUPPLIERPowerSemiconductor &Ferrite…I1.71 d1Die-Cast Al Box &Fin GasketC/T 565 sI1.51 d2DC-Link Cap &IGBT BaseC/T 648 sI2.00 d3DC String MPPTCard PlugC/T 897 sI1.11 d4Salt Mist Seal &Fan MountC/T 665 sI0.80 d5Dynamic GridFault Ride TestC/T 532 sI1.40 dCUSTOMERUtility SolarPV EPCs65 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Die-Cast Al Box & Fin Gasket565 s25 min95%99.1%65111 (1.71 d)87
2. DC-Link Cap & IGBT Base648 s20 min93%98.4%3998 (1.51 d)73
3. DC String MPPT Card Plug897 s18 min86%95.8%26130 (2.00 d)47
4. Salt Mist Seal & Fan Mount665 s12 min93%97.6%1672 (1.11 d)70
5. Dynamic Grid Fault Ride Test532 s10 min96%99.0%1352 (0.80 d)91

Key figures

Takt time
831 s
Lead time
8.58 d
Value-added time
3,307 s
Process cycle efficiency (PCE)
0.71%
Rolled throughput yield (RTY)
90.3%
Customer demand per day
65 units
Line capacity per day
47 units
Bottleneck
DC String MPPT Card Plug

Reading the bottleneck

The bottleneck is "DC String MPPT Card Plug": it can process 47 units per day against a demand of 65 units, so it falls short of demand by 27.5%. Once downtime and scrap are counted, its cycle time grows from 897 s to 1,089 s, against a takt of 831 s. The largest loss at this step is equipment downtime (uptime 86%), about 146 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.