350kW Liquid-Cooled EV Highway Fast Charger

Product family: Ultra-Fast Dual CCS2 Dispensers.

Flow: SiC 30kW Rectifier Bricks → Weatherproof IP54 Enclosure → Power Stack SiC Brick Rack → Liquid-Cooled Cable Plumbed → OCPP 2.0.1 Modem & Payment → 350kW Regenerative Load Bank → CPO Highway Charge Networks

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 350kW Liquid-Cooled EV Highway Fast ChargerSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. SiC 30kW Rectifier Bricks → Weatherproof IP54 Enclosure (1,311 s) → Power Stack SiC Brick Rack (1,504 s) → Liquid-Cooled Cable Plumbed (2,083 s) → OCPP 2.0.1 Modem & Payment (1,543 s) → 350kW Regenerative Load Bank (1,234 s) → CPO Highway Charge Networks.SUPPLIERSiC 30kWRectifierBricksI1.71 d1Weatherproof IP54EnclosureC/T 1,311 sI1.50 d2Power Stack SiCBrick RackC/T 1,504 sI2.00 d3Liquid-CooledCable PlumbedC/T 2,083 sI1.11 d4OCPP 2.0.1 Modem& PaymentC/T 1,543 sI0.79 d5350kWRegenerative Loa…C/T 1,234 sI1.39 dCUSTOMERCPO HighwayCharge Networks28 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Weatherproof IP54 Enclosure1,311 s25 min95%99.1%2848 (1.71 d)38
2. Power Stack SiC Brick Rack1,504 s20 min93%98.4%1742 (1.50 d)32
3. Liquid-Cooled Cable Plumbed2,083 s18 min86%95.8%1156 (2.00 d)20
4. OCPP 2.0.1 Modem & Payment1,543 s12 min93%97.6%731 (1.11 d)30
5. 350kW Regenerative Load Bank1,234 s10 min96%99.0%622 (0.79 d)39

Key figures

Takt time
1,929 s
Lead time
8.64 d
Value-added time
7,675 s
Process cycle efficiency (PCE)
1.6%
Rolled throughput yield (RTY)
90.3%
Customer demand per day
28 units
Line capacity per day
20 units
Bottleneck
Liquid-Cooled Cable Plumbed

Reading the bottleneck

The bottleneck is "Liquid-Cooled Cable Plumbed": it can process 20 units per day against a demand of 28 units, so it falls short of demand by 27.6%. Once downtime and scrap are counted, its cycle time grows from 2,083 s to 2,528 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 86%), about 339 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.