Twin-Bent-Tube Coriolis Mass Flowmeter
Product family: Custody-Transfer Mass Meters.
Flow: Ni-Cr-Mo C22 Seamless → CNC Hydro-Bent Twin Tubes → Orbital Flange Purge Weld → Drive & Pick-Off Coil Mount → Secondary Containment Shell → Gravimetric Water Flow Rig → Oil, Chem & Food Metering
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. CNC Hydro-Bent Twin Tubes | 409 s | 30 min | 94% | 97.8% | 95 | 171 (1.80 d) | 117 |
| 2. Orbital Flange Purge Weld | 477 s | 45 min | 90% | 96.5% | 114 | 181 (1.91 d) | 94 |
| 3. Drive & Pick-Off Coil Mount | 614 s | 25 min | 84% | 93.8% | 48 | 200 (2.11 d) | 65 |
| 4. Secondary Containment Shell | 432 s | 15 min | 95% | 98.4% | 29 | 95 (1.00 d) | 110 |
| 5. Gravimetric Water Flow Rig | 341 s | 8 min | 97% | 99.1% | 19 | 67 (0.71 d) | 145 |
Key figures
- Takt time
- 568 s
- Lead time
- 8.76 d
- Value-added time
- 2,273 s
- Process cycle efficiency (PCE)
- 0.48%
- Rolled throughput yield (RTY)
- 86.3%
- Customer demand per day
- 95 units
- Line capacity per day
- 65 units
- Bottleneck
- Drive & Pick-Off Coil Mount
Reading the bottleneck
The bottleneck is "Drive & Pick-Off Coil Mount": it can process 65 units per day against a demand of 95 units, so it falls short of demand by 31.1%. Once downtime and scrap are counted, its cycle time grows from 614 s to 779 s, against a takt of 568 s. The largest loss at this step is equipment downtime (uptime 84%), about 117 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Optics, Photonics & Precision Sensors: Optics, Photonics & Precision Sensors
- 400G OSFP / QSFP-DD Optical Transceiver
- 4K Chip-on-Tip Surgical Laparoscope Optics
- 1550nm Long-Range Automotive Roof LiDAR
- 640x512 Uncooled VOx LWIR Thermal Camera Core
- Plan-Apochromat 100x Oil Objective Assembly
- 128-Element Phased-Array Ultrasound Probe
- N-Type TOPCon Bifacial Solar Cell Fab Line
- High-Power 976nm Fiber-Coupled Pump Diode
- Piezoresistive 316L Hygienic Pressure Transmitter
- Holographic Diffraction Spectroscopic Grating
- Adaptive Pixel-LED Automotive Headlamp Matrix