640x512 Uncooled VOx LWIR Thermal Camera Core

Product family: Microbolometer Infrared Cores.

Flow: Microbolometer Sensor Suppliers → Diamond-Turn Ge Lens → DLC Hard-Carbon AR Coat → VOx Wafer Sensor PCB Reflow → Dry Shutter Active Focus → NETD <35mK Blackbody Calib → Industrial & Defense Thermal

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 640x512 Uncooled VOx LWIR Thermal Camera CoreSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Microbolometer Sensor Suppliers → Diamond-Turn Ge Lens (122 s) → DLC Hard-Carbon AR Coat (142 s) → VOx Wafer Sensor PCB Reflow (182 s) → Dry Shutter Active Focus (128 s) → NETD <35mK Blackbody Calib (101 s) → Industrial & Defense Thermal.SUPPLIERMicrobolometerSensorSuppliersI1.80 d1Diamond-Turn GeLensC/T 122 sI1.90 d2DLC Hard-CarbonAR CoatC/T 142 sI2.10 d3VOx Wafer SensorPCB ReflowC/T 182 sI1.00 d4Dry ShutterActive FocusC/T 128 sI0.70 d5NETD <35mKBlackbody CalibC/T 101 sI1.20 dCUSTOMERIndustrial &Defense Thermal320 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Diamond-Turn Ge Lens122 s30 min94%97.8%320576 (1.80 d)393
2. DLC Hard-Carbon AR Coat142 s45 min90%96.5%384608 (1.90 d)317
3. VOx Wafer Sensor PCB Reflow182 s25 min84%93.8%160672 (2.10 d)221
4. Dry Shutter Active Focus128 s15 min95%98.4%96320 (1.00 d)372
5. NETD <35mK Blackbody Calib101 s8 min97%99.1%64224 (0.70 d)491

Key figures

Takt time
169 s
Lead time
8.71 d
Value-added time
675 s
Process cycle efficiency (PCE)
0.14%
Rolled throughput yield (RTY)
86.3%
Customer demand per day
320 units
Line capacity per day
221 units
Bottleneck
VOx Wafer Sensor PCB Reflow

Reading the bottleneck

The bottleneck is "VOx Wafer Sensor PCB Reflow": it can process 221 units per day against a demand of 320 units, so it falls short of demand by 31.0%. Once downtime and scrap are counted, its cycle time grows from 182 s to 231 s, against a takt of 169 s. The largest loss at this step is equipment downtime (uptime 84%), about 34.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.