4K Chip-on-Tip Surgical Laparoscope Optics
Product family: Autoclavable Medical Scopes.
Flow: Imaging Fiber & CMOS Sensor Suppliers → Sapphire Tip Gold Brazing → Micro CMOS Active Lens Gluing → Optical Illumination Fiber Pack → Laser Titanium Seam Seal → 50-Cycle Steam Autoclave QC → Hospital Endoscopy Units
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Sapphire Tip Gold Brazing | 299 s | 30 min | 94% | 97.8% | 65 | 117 (1.80 d) | 77 |
| 2. Micro CMOS Active Lens Gluing | 349 s | 45 min | 90% | 96.5% | 78 | 124 (1.91 d) | 62 |
| 3. Optical Illumination Fiber Pack | 449 s | 25 min | 84% | 93.8% | 33 | 137 (2.11 d) | 42 |
| 4. Laser Titanium Seam Seal | 316 s | 15 min | 95% | 98.4% | 20 | 65 (1.00 d) | 71 |
| 5. 50-Cycle Steam Autoclave QC | 249 s | 8 min | 97% | 99.1% | 13 | 46 (0.71 d) | 95 |
Key figures
- Takt time
- 415 s
- Lead time
- 8.78 d
- Value-added time
- 1,662 s
- Process cycle efficiency (PCE)
- 0.70%
- Rolled throughput yield (RTY)
- 86.3%
- Customer demand per day
- 65 units
- Line capacity per day
- 42 units
- Bottleneck
- Optical Illumination Fiber Pack
Reading the bottleneck
The bottleneck is "Optical Illumination Fiber Pack": it can process 42 units per day against a demand of 65 units, so it falls short of demand by 35.1%. Once downtime and scrap are counted, its cycle time grows from 449 s to 570 s, against a takt of 415 s. The largest loss at this step is equipment downtime (uptime 84%), about 85.5 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Optics, Photonics & Precision Sensors: Optics, Photonics & Precision Sensors
- 400G OSFP / QSFP-DD Optical Transceiver
- 1550nm Long-Range Automotive Roof LiDAR
- 640x512 Uncooled VOx LWIR Thermal Camera Core
- Plan-Apochromat 100x Oil Objective Assembly
- 128-Element Phased-Array Ultrasound Probe
- N-Type TOPCon Bifacial Solar Cell Fab Line
- High-Power 976nm Fiber-Coupled Pump Diode
- Piezoresistive 316L Hygienic Pressure Transmitter
- Twin-Bent-Tube Coriolis Mass Flowmeter
- Holographic Diffraction Spectroscopic Grating
- Adaptive Pixel-LED Automotive Headlamp Matrix