N-Type TOPCon Bifacial Solar Cell Fab Line

Product family: 25.8% Efficiency Solar Cells.

Flow: Silicon Ingot Suppliers → Alkaline Texture & Boron Diff → LPCVD Poly-Si Tunnel Oxide → PECVD AlOx & SiNx Passiv → Ultrasonic Silver Screen Print → Flash IV Efficiency & EL Bin → PV Module Assembly Plants

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: N-Type TOPCon Bifacial Solar Cell Fab LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Silicon Ingot Suppliers → Alkaline Texture & Boron Diff (1.4 s) → LPCVD Poly-Si Tunnel Oxide (1.6 s) → PECVD AlOx & SiNx Passiv (2.1 s) → Ultrasonic Silver Screen Print (1.5 s) → Flash IV Efficiency & EL Bin (1.2 s) → PV Module Assembly Plants.SUPPLIERSilicon IngotSuppliersI1.80 d1Alkaline Texture& Boron DiffC/T 1.4 sI1.90 d2LPCVD Poly-SiTunnel OxideC/T 1.6 sI2.10 d3PECVD AlOx & SiNxPassivC/T 2.1 sI1.00 d4Ultrasonic SilverScreen PrintC/T 1.5 sI0.70 d5Flash IVEfficiency & EL…C/T 1.2 sI1.20 dCUSTOMERPV ModuleAssembly Plants42,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Alkaline Texture & Boron Diff1.4 s30 min94%97.8%42,00075,600 (1.80 d)52,007
2. LPCVD Poly-Si Tunnel Oxide1.6 s45 min90%96.5%50,40079,800 (1.90 d)42,746
3. PECVD AlOx & SiNx Passiv2.1 s25 min84%93.8%21,00088,200 (2.10 d)29,266
4. Ultrasonic Silver Screen Print1.5 s15 min95%98.4%12,60042,000 (1.00 d)48,610
5. Flash IV Efficiency & EL Bin1.2 s8 min97%99.1%8,40029,400 (0.70 d)62,963

Key figures

Takt time
1.9 s
Lead time
8.70 d
Value-added time
7.8 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
86.3%
Customer demand per day
42,000 units
Line capacity per day
29,266 units
Bottleneck
PECVD AlOx & SiNx Passiv

Reading the bottleneck

The bottleneck is "PECVD AlOx & SiNx Passiv": it can process 29,266 units per day against a demand of 42,000 units, so it falls short of demand by 30.3%. Once downtime and scrap are counted, its cycle time grows from 2.1 s to 2.7 s, against a takt of 1.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Optics, Photonics & Precision Sensors: Optics, Photonics & Precision Sensors