Adaptive Pixel-LED Automotive Headlamp Matrix

Product family: 1024-Pixel ADB Headlamps.

Flow: Multi-LED Suppliers → Micro-LED Pixel Array Reflow → LSR Liquid Silicone Lens Mold → Heatpipe Die-Cast Heatsink → CAN Stepper & Poly Weld → Goniophotometer Beam Cut → Tier-1 Auto Lighting

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Adaptive Pixel-LED Automotive Headlamp MatrixSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Multi-LED Suppliers → Micro-LED Pixel Array Reflow (35.3 s) → LSR Liquid Silicone Lens Mold (41.0 s) → Heatpipe Die-Cast Heatsink (53.0 s) → CAN Stepper & Poly Weld (37.3 s) → Goniophotometer Beam Cut (29.5 s) → Tier-1 Auto Lighting.SUPPLIERMulti-LEDSuppliersI1.80 d1Micro-LED PixelArray ReflowC/T 35.3 sI1.90 d2LSR LiquidSilicone Lens…C/T 41.0 sI2.10 d3Heatpipe Die-CastHeatsinkC/T 53.0 sI1.00 d4CAN Stepper &Poly WeldC/T 37.3 sI0.70 d5GoniophotometerBeam CutC/T 29.5 sI1.20 dCUSTOMERTier-1 AutoLighting1,100 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Micro-LED Pixel Array Reflow35.3 s30 min94%97.8%1,1001,980 (1.80 d)1,359
2. LSR Liquid Silicone Lens Mold41.0 s45 min90%96.5%1,3202,090 (1.90 d)1,096
3. Heatpipe Die-Cast Heatsink53.0 s25 min84%93.8%5502,310 (2.10 d)758
4. CAN Stepper & Poly Weld37.3 s15 min95%98.4%3301,100 (1.00 d)1,278
5. Goniophotometer Beam Cut29.5 s8 min97%99.1%220770 (0.70 d)1,681

Key figures

Takt time
49.1 s
Lead time
8.70 d
Value-added time
196 s
Process cycle efficiency (PCE)
0.042%
Rolled throughput yield (RTY)
86.3%
Customer demand per day
1,100 units
Line capacity per day
758 units
Bottleneck
Heatpipe Die-Cast Heatsink

Reading the bottleneck

The bottleneck is "Heatpipe Die-Cast Heatsink": it can process 758 units per day against a demand of 1,100 units, so it falls short of demand by 31.1%. Once downtime and scrap are counted, its cycle time grows from 53.0 s to 67.3 s, against a takt of 49.1 s. The largest loss at this step is equipment downtime (uptime 84%), about 10.1 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.