1550nm Long-Range Automotive Roof LiDAR

Product family: Solid-State & Polygon LiDAR.

Flow: InGaAs APDs & 1550 Lasers → 1550nm Fiber Laser Assemble → Polygon Scanner Balance Align → InGaAs Receiver Active Align → IP69K Nitrogen Sealed Shell → 250m Target Point-Cloud QC → Autonomous Fleet OEMs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 1550nm Long-Range Automotive Roof LiDARSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. InGaAs APDs & 1550 Lasers → 1550nm Fiber Laser Assemble (185 s) → Polygon Scanner Balance Align (216 s) → InGaAs Receiver Active Align (278 s) → IP69K Nitrogen Sealed Shell (195 s) → 250m Target Point-Cloud QC (154 s) → Autonomous Fleet OEMs.SUPPLIERInGaAs APDs &1550 LasersI1.80 d11550nm FiberLaser AssembleC/T 185 sI1.90 d2Polygon ScannerBalance AlignC/T 216 sI2.10 d3InGaAs ReceiverActive AlignC/T 278 sI1.00 d4IP69K NitrogenSealed ShellC/T 195 sI0.70 d5250m TargetPoint-Cloud QCC/T 154 sI1.20 dCUSTOMERAutonomousFleet OEMs210 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 1550nm Fiber Laser Assemble185 s30 min94%97.8%210378 (1.80 d)259
2. Polygon Scanner Balance Align216 s45 min90%96.5%252399 (1.90 d)208
3. InGaAs Receiver Active Align278 s25 min84%93.8%105441 (2.10 d)145
4. IP69K Nitrogen Sealed Shell195 s15 min95%98.4%63210 (1.00 d)244
5. 250m Target Point-Cloud QC154 s8 min97%99.1%42147 (0.70 d)322

Key figures

Takt time
257 s
Lead time
8.72 d
Value-added time
1,028 s
Process cycle efficiency (PCE)
0.22%
Rolled throughput yield (RTY)
86.3%
Customer demand per day
210 units
Line capacity per day
145 units
Bottleneck
InGaAs Receiver Active Align

Reading the bottleneck

The bottleneck is "InGaAs Receiver Active Align": it can process 145 units per day against a demand of 210 units, so it falls short of demand by 31.2%. Once downtime and scrap are counted, its cycle time grows from 278 s to 353 s, against a takt of 257 s. The largest loss at this step is equipment downtime (uptime 84%), about 53.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.