Holographic Diffraction Spectroscopic Grating

Product family: UV-Vis Analytical Gratings.

Flow: Low-Expansion Glass Substrates → Substrate Lambda/10 Polish → Laser Lloyd-Mirror Exposure → Ion-Beam Blaze Angle Etch → Al + MgF2 Reflective Coat → Stray-Light & Blaze Test → Pharma HPLC & Lab OEMs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Holographic Diffraction Spectroscopic GratingSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Low-Expansion Glass Substrates → Substrate Lambda/10 Polish (139 s) → Laser Lloyd-Mirror Exposure (162 s) → Ion-Beam Blaze Angle Etch (208 s) → Al + MgF2 Reflective Coat (147 s) → Stray-Light & Blaze Test (116 s) → Pharma HPLC & Lab OEMs.SUPPLIERLow-ExpansionGlassSubstratesI1.80 d1SubstrateLambda/10 PolishC/T 139 sI1.90 d2LaserLloyd-Mirror…C/T 162 sI2.10 d3Ion-Beam BlazeAngle EtchC/T 208 sI1.00 d4Al + MgF2Reflective CoatC/T 147 sI0.70 d5Stray-Light &Blaze TestC/T 116 sI1.20 dCUSTOMERPharma HPLC &Lab OEMs140 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Substrate Lambda/10 Polish139 s30 min94%97.8%140252 (1.80 d)167
2. Laser Lloyd-Mirror Exposure162 s45 min90%96.5%168266 (1.90 d)133
3. Ion-Beam Blaze Angle Etch208 s25 min84%93.8%70294 (2.10 d)91
4. Al + MgF2 Reflective Coat147 s15 min95%98.4%42140 (1.00 d)153
5. Stray-Light & Blaze Test116 s8 min97%99.1%2898 (0.70 d)204

Key figures

Takt time
193 s
Lead time
8.73 d
Value-added time
772 s
Process cycle efficiency (PCE)
0.33%
Rolled throughput yield (RTY)
86.3%
Customer demand per day
140 parts
Line capacity per day
91 parts
Bottleneck
Ion-Beam Blaze Angle Etch

Reading the bottleneck

The bottleneck is "Ion-Beam Blaze Angle Etch": it can process 91 parts per day against a demand of 140 parts, so it falls short of demand by 35.1%. Once downtime and scrap are counted, its cycle time grows from 208 s to 264 s, against a takt of 193 s. The largest loss at this step is equipment downtime (uptime 84%), about 39.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Optics, Photonics & Precision Sensors: Optics, Photonics & Precision Sensors