High-Power 976nm Fiber-Coupled Pump Diode

Product family: 150W Industrial Fiber Lasers.

Flow: GaAs Laser Bars → Indium/AuSn Bar Bonding → Fast-Axis Micro-Lens Collim → Multi-Emitter Knife Prism → 105um Fiber Coupling Align → 48h LIV Optical Power Burn → Fiber Laser Cutting OEMs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: High-Power 976nm Fiber-Coupled Pump DiodeSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. GaAs Laser Bars → Indium/AuSn Bar Bonding (150 s) → Fast-Axis Micro-Lens Collim (174 s) → Multi-Emitter Knife Prism (224 s) → 105um Fiber Coupling Align (158 s) → 48h LIV Optical Power Burn (125 s) → Fiber Laser Cutting OEMs.SUPPLIERGaAs Laser BarsI1.80 d1Indium/AuSn BarBondingC/T 150 sI1.90 d2Fast-AxisMicro-Lens CollimC/T 174 sI2.10 d3Multi-EmitterKnife PrismC/T 224 sI1.00 d4105um FiberCoupling AlignC/T 158 sI0.70 d548h LIV OpticalPower BurnC/T 125 sI1.20 dCUSTOMERFiber LaserCutting OEMs260 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Indium/AuSn Bar Bonding150 s30 min94%97.8%260468 (1.80 d)320
2. Fast-Axis Micro-Lens Collim174 s45 min90%96.5%312494 (1.90 d)258
3. Multi-Emitter Knife Prism224 s25 min84%93.8%130546 (2.10 d)179
4. 105um Fiber Coupling Align158 s15 min95%98.4%78260 (1.00 d)302
5. 48h LIV Optical Power Burn125 s8 min97%99.1%52182 (0.70 d)397

Key figures

Takt time
208 s
Lead time
8.72 d
Value-added time
831 s
Process cycle efficiency (PCE)
0.18%
Rolled throughput yield (RTY)
86.3%
Customer demand per day
260 units
Line capacity per day
179 units
Bottleneck
Multi-Emitter Knife Prism

Reading the bottleneck

The bottleneck is "Multi-Emitter Knife Prism": it can process 179 units per day against a demand of 260 units, so it falls short of demand by 31.0%. Once downtime and scrap are counted, its cycle time grows from 224 s to 284 s, against a takt of 208 s. The largest loss at this step is equipment downtime (uptime 84%), about 42.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Optics, Photonics & Precision Sensors: Optics, Photonics & Precision Sensors