Laminated Silicone Rail Traction Busbar

Product family: 3kV Locomotive Bus Stacks.

Flow: CU-ETP Sheet & Aramid Paper → Waterjet Multi-Layer Plates → Tin/Silver Ultrasonic Plate → Heat-Activated Adhesive Press → Epoxy Powder Edge Seal → 12kV Partial Discharge Bench → Electric Locomotives

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Laminated Silicone Rail Traction BusbarSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. CU-ETP Sheet & Aramid Paper → Waterjet Multi-Layer Plates (490 s) → Tin/Silver Ultrasonic Plate (590 s) → Heat-Activated Adhesive Press (770 s) → Epoxy Powder Edge Seal (562 s) → 12kV Partial Discharge Bench (432 s) → Electric Locomotives.SUPPLIERCU-ETP Sheet &Aramid PaperI1.60 d1WaterjetMulti-Layer…C/T 490 sI1.80 d2Tin/SilverUltrasonic PlateC/T 590 sI2.40 d3Heat-ActivatedAdhesive PressC/T 770 sI1.40 d4Epoxy Powder EdgeSealC/T 562 sI0.91 d512kV PartialDischarge BenchC/T 432 sI1.80 dCUSTOMERElectricLocomotives75 / assemblies

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Waterjet Multi-Layer Plates490 s35 min94%99.2%113120 (1.60 d)100
2. Tin/Silver Ultrasonic Plate590 s50 min91%98.5%113135 (1.80 d)79
3. Heat-Activated Adhesive Press770 s95 min83%96.4%150180 (2.40 d)53
4. Epoxy Powder Edge Seal562 s30 min93%98.7%75105 (1.40 d)85
5. 12kV Partial Discharge Bench432 s12 min97%99.3%3868 (0.91 d)117

Key figures

Takt time
720 s
Lead time
9.96 d
Value-added time
2,844 s
Process cycle efficiency (PCE)
0.53%
Rolled throughput yield (RTY)
92.3%
Customer demand per day
75 assemblies
Line capacity per day
53 assemblies
Bottleneck
Heat-Activated Adhesive Press

Reading the bottleneck

The bottleneck is "Heat-Activated Adhesive Press": it can process 53 assemblies per day against a demand of 75 assemblies, so it falls short of demand by 29.1%. Once downtime and scrap are counted, its cycle time grows from 770 s to 962 s, against a takt of 720 s. The largest loss at this step is equipment downtime (uptime 83%), about 158 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.