NbTi Superconducting MRI Magnet Cryo Wire
Product family: Cu-Stabilized NbTi Strands.
Flow: NbTi Billet Suppliers → Multi-Stack Billet Extrude → Cold Multi-Pass Restack Draw → Twist Pitch & Heat Treat → Polyvinyl-Formal Cryo Enamel Coat → 4.2K Liquid Helium Ic Quench → Hospital MRI Magnet Fabs
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Multi-Stack Billet Extrude | 2,623 s | 35 min | 94% | 99.2% | 21 | 22 (1.57 d) | 19 |
| 2. Cold Multi-Pass Restack Draw | 3,163 s | 50 min | 91% | 98.5% | 21 | 25 (1.79 d) | 15 |
| 3. Twist Pitch & Heat Treat | 4,127 s | 95 min | 83% | 96.4% | 28 | 34 (2.43 d) | 10 |
| 4. Polyvinyl-Formal Cryo Enamel Coat | 3,009 s | 30 min | 93% | 98.7% | 14 | 20 (1.43 d) | 16 |
| 5. 4.2K Liquid Helium Ic Quench | 2,314 s | 12 min | 97% | 99.3% | 7 | 13 (0.93 d) | 22 |
Key figures
- Takt time
- 3,857 s
- Lead time
- 10.2 d
- Value-added time
- 15,236 s
- Process cycle efficiency (PCE)
- 2.8%
- Rolled throughput yield (RTY)
- 92.3%
- Customer demand per day
- 14 batches
- Line capacity per day
- 10 batches
- Bottleneck
- Twist Pitch & Heat Treat
Reading the bottleneck
The bottleneck is "Twist Pitch & Heat Treat": it can process 10 batches per day against a demand of 14 batches, so it falls short of demand by 29.2%. Once downtime and scrap are counted, its cycle time grows from 4,127 s to 5,158 s, against a takt of 3,857 s. The largest loss at this step is equipment downtime (uptime 83%), about 845 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Power Cables & Fiber Extrusion: Power Cables & Fiber Extrusion
- 220kV Dynamic Offshore Wind Export Cable
- 33kV Underground Distribution AL/XLPE Cable
- 864-Fiber Loose-Tube Armored Backbone Cable
- 40Gbps Cat8 S/FTP Data Center Patch Trunk
- 1500V EN-50618 Cross-Linked Solar Cable
- 10M-Flex Torsion Robotics Drag-Chain Cable
- Corrugated Copper 7/8" Low-Loss 5G Feeder
- 80m Traveling Flat Halide-Free Lift Cable
- Laminated Silicone Rail Traction Busbar
- BS-6387 CWZ 950°C Mica Fire-Survival Cable
- Automated ICE/BEV Cockpit Wire Harness