BS-6387 CWZ 950°C Mica Fire-Survival Cable

Product family: Tunnel Emergency Life Safety.

Flow: Mica Glass Phlogopite Tape → Double-Wrap Mica Tape Head → Ceramifiable Silicone Coat → Laminated Al-Screen & Drain → Low-Smoke LSZH Armor Coat → 950°C Water Spray Fire Lot → Metro Tunnels & Airports

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: BS-6387 CWZ 950°C Mica Fire-Survival CableSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Mica Glass Phlogopite Tape → Double-Wrap Mica Tape Head (874 s) → Ceramifiable Silicone Coat (1,054 s) → Laminated Al-Screen & Drain (1,376 s) → Low-Smoke LSZH Armor Coat (1,003 s) → 950°C Water Spray Fire Lot (771 s) → Metro Tunnels & Airports.SUPPLIERMica GlassPhlogopite TapeI1.60 d1Double-Wrap MicaTape HeadC/T 874 sI1.81 d2CeramifiableSilicone CoatC/T 1,054 sI2.40 d3LaminatedAl-Screen & DrainC/T 1,376 sI1.40 d4Low-Smoke LSZHArmor CoatC/T 1,003 sI0.90 d5950°C Water SprayFire LotC/T 771 sI1.81 dCUSTOMERMetro Tunnels &Airports42 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Double-Wrap Mica Tape Head874 s35 min94%99.2%6367 (1.60 d)56
2. Ceramifiable Silicone Coat1,054 s50 min91%98.5%6376 (1.81 d)44
3. Laminated Al-Screen & Drain1,376 s95 min83%96.4%84101 (2.40 d)30
4. Low-Smoke LSZH Armor Coat1,003 s30 min93%98.7%4259 (1.40 d)48
5. 950°C Water Spray Fire Lot771 s12 min97%99.3%2138 (0.90 d)66

Key figures

Takt time
1,286 s
Lead time
10.0 d
Value-added time
5,078 s
Process cycle efficiency (PCE)
0.94%
Rolled throughput yield (RTY)
92.3%
Customer demand per day
42 batches
Line capacity per day
30 batches
Bottleneck
Laminated Al-Screen & Drain

Reading the bottleneck

The bottleneck is "Laminated Al-Screen & Drain": it can process 30 batches per day against a demand of 42 batches, so it falls short of demand by 29.2%. Once downtime and scrap are counted, its cycle time grows from 1,376 s to 1,720 s, against a takt of 1,286 s. The largest loss at this step is equipment downtime (uptime 83%), about 282 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.