220kV Dynamic Offshore Wind Export Cable
Product family: XLPE Armored Subsea Power.
Flow: Cu Rod & Galvanized Wire → Sector Copper Stranding → Triple XLPE Extrude & Degas → Lead Alloy Radial Barrier → Double Helical Wire Armoring → 100-Ton Turntable & HiPot → Offshore Wind Developers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Sector Copper Stranding | 4,590 s | 35 min | 94% | 99.2% | 18 | 19 (1.58 d) | 16 |
| 2. Triple XLPE Extrude & Degas | 5,535 s | 50 min | 91% | 98.5% | 18 | 22 (1.83 d) | 13 |
| 3. Lead Alloy Radial Barrier | 7,223 s | 95 min | 83% | 96.4% | 24 | 29 (2.42 d) | 9 |
| 4. Double Helical Wire Armoring | 5,265 s | 30 min | 93% | 98.7% | 12 | 17 (1.42 d) | 14 |
| 5. 100-Ton Turntable & HiPot | 4,050 s | 12 min | 97% | 99.3% | 6 | 11 (0.92 d) | 19 |
Key figures
- Takt time
- 6,750 s
- Lead time
- 10.3 d
- Value-added time
- 26,663 s
- Process cycle efficiency (PCE)
- 3.2%
- Rolled throughput yield (RTY)
- 92.3%
- Customer demand per day
- 12 batches
- Line capacity per day
- 9 batches
- Bottleneck
- Lead Alloy Radial Barrier
Reading the bottleneck
The bottleneck is "Lead Alloy Radial Barrier": it can process 9 batches per day against a demand of 12 batches, so it falls short of demand by 27.9%. Once downtime and scrap are counted, its cycle time grows from 7,223 s to 9,027 s, against a takt of 6,750 s. The largest loss at this step is equipment downtime (uptime 83%), about 1,479 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Power Cables & Fiber Extrusion: Power Cables & Fiber Extrusion
- 33kV Underground Distribution AL/XLPE Cable
- 864-Fiber Loose-Tube Armored Backbone Cable
- 40Gbps Cat8 S/FTP Data Center Patch Trunk
- 1500V EN-50618 Cross-Linked Solar Cable
- 10M-Flex Torsion Robotics Drag-Chain Cable
- Corrugated Copper 7/8" Low-Loss 5G Feeder
- 80m Traveling Flat Halide-Free Lift Cable
- NbTi Superconducting MRI Magnet Cryo Wire
- Laminated Silicone Rail Traction Busbar
- BS-6387 CWZ 950°C Mica Fire-Survival Cable
- Automated ICE/BEV Cockpit Wire Harness