40Gbps Cat8 S/FTP Data Center Patch Trunk
Product family: LSZH Foil-Shielded Copper Trunks.
Flow: OFHC Bare Copper Wire → Dual Gas-Injected Skin-Foam → High-Speed Pair Twinning → Al Foil Wrap & 4-Pair Braid → LSZH Jacket & RJ45 Crimp → Cable Analyzer 2GHz Sweep Pass → Hyperscale Switch Fabrics
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Dual Gas-Injected Skin-Foam | 26.2 s | 35 min | 94% | 99.2% | 2,100 | 2,240 (1.60 d) | 1,872 |
| 2. High-Speed Pair Twinning | 31.6 s | 50 min | 91% | 98.5% | 2,100 | 2,520 (1.80 d) | 1,475 |
| 3. Al Foil Wrap & 4-Pair Braid | 41.0 s | 95 min | 83% | 96.4% | 2,800 | 3,360 (2.40 d) | 998 |
| 4. LSZH Jacket & RJ45 Crimp | 30.1 s | 30 min | 93% | 98.7% | 1,400 | 1,960 (1.40 d) | 1,592 |
| 5. Cable Analyzer 2GHz Sweep Pass | 23.1 s | 12 min | 97% | 99.3% | 700 | 1,260 (0.90 d) | 2,192 |
Key figures
- Takt time
- 38.6 s
- Lead time
- 9.90 d
- Value-added time
- 152 s
- Process cycle efficiency (PCE)
- 0.028%
- Rolled throughput yield (RTY)
- 92.3%
- Customer demand per day
- 1,400 units
- Line capacity per day
- 998 units
- Bottleneck
- Al Foil Wrap & 4-Pair Braid
Reading the bottleneck
The bottleneck is "Al Foil Wrap & 4-Pair Braid": it can process 998 units per day against a demand of 1,400 units, so it falls short of demand by 28.7%. Once downtime and scrap are counted, its cycle time grows from 41.0 s to 51.2 s, against a takt of 38.6 s. The largest loss at this step is equipment downtime (uptime 83%), about 8.4 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Power Cables & Fiber Extrusion: Power Cables & Fiber Extrusion
- 220kV Dynamic Offshore Wind Export Cable
- 33kV Underground Distribution AL/XLPE Cable
- 864-Fiber Loose-Tube Armored Backbone Cable
- 1500V EN-50618 Cross-Linked Solar Cable
- 10M-Flex Torsion Robotics Drag-Chain Cable
- Corrugated Copper 7/8" Low-Loss 5G Feeder
- 80m Traveling Flat Halide-Free Lift Cable
- NbTi Superconducting MRI Magnet Cryo Wire
- Laminated Silicone Rail Traction Busbar
- BS-6387 CWZ 950°C Mica Fire-Survival Cable
- Automated ICE/BEV Cockpit Wire Harness