864-Fiber Loose-Tube Armored Backbone Cable

Product family: Dry-Core Micro-Trench Fiber.

Flow: Single-Mode G.652 Fiber → Optical Color & UV Cure → PBT Gel-Free Buffer Extrude → SZ Oscillating Core Strand → Corrugated Steel Tape Coat → 1550nm OTDR Reel Loss Check → National Telco & Hyperscalers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 864-Fiber Loose-Tube Armored Backbone CableSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Single-Mode G.652 Fiber → Optical Color & UV Cure (648 s) → PBT Gel-Free Buffer Extrude (781 s) → SZ Oscillating Core Strand (1,020 s) → Corrugated Steel Tape Coat (743 s) → 1550nm OTDR Reel Loss Check (572 s) → National Telco & Hyperscalers.SUPPLIERSingle-ModeG.652 FiberI1.60 d1Optical Color &UV CureC/T 648 sI1.80 d2PBT Gel-FreeBuffer ExtrudeC/T 781 sI2.40 d3SZ OscillatingCore StrandC/T 1,020 sI1.40 d4Corrugated SteelTape CoatC/T 743 sI0.91 d51550nm OTDR ReelLoss CheckC/T 572 sI1.80 dCUSTOMERNational Telco& Hyperscalers85 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Optical Color & UV Cure648 s35 min94%99.2%128136 (1.60 d)115
2. PBT Gel-Free Buffer Extrude781 s50 min91%98.5%128153 (1.80 d)91
3. SZ Oscillating Core Strand1,020 s95 min83%96.4%170204 (2.40 d)61
4. Corrugated Steel Tape Coat743 s30 min93%98.7%85119 (1.40 d)98
5. 1550nm OTDR Reel Loss Check572 s12 min97%99.3%4377 (0.91 d)134

Key figures

Takt time
953 s
Lead time
9.95 d
Value-added time
3,764 s
Process cycle efficiency (PCE)
0.47%
Rolled throughput yield (RTY)
92.3%
Customer demand per day
85 batches
Line capacity per day
61 batches
Bottleneck
SZ Oscillating Core Strand

Reading the bottleneck

The bottleneck is "SZ Oscillating Core Strand": it can process 61 batches per day against a demand of 85 batches, so it falls short of demand by 27.9%. Once downtime and scrap are counted, its cycle time grows from 1,020 s to 1,275 s, against a takt of 953 s. The largest loss at this step is equipment downtime (uptime 83%), about 209 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Power Cables & Fiber Extrusion: Power Cables & Fiber Extrusion