Corrugated Copper 7/8" Low-Loss 5G Feeder

Product family: Foam-Dielectric Coax Jumpers.

Flow: Oxygen-Free Cu Strip → Smooth Rod Weld & Foam Core → Seam Weld Copper Corrugator → Outdoor Black PE Oversheath → N-Type / 4.3-10 Solder End → VSWR <1.12 & PIM Sweep → Cell Tower Installations

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Corrugated Copper 7/8" Low-Loss 5G FeederSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Oxygen-Free Cu Strip → Smooth Rod Weld & Foam Core (193 s) → Seam Weld Copper Corrugator (233 s) → Outdoor Black PE Oversheath (304 s) → N-Type / 4.3-10 Solder End (222 s) → VSWR <1.12 & PIM Sweep (171 s) → Cell Tower Installations.SUPPLIEROxygen-Free CuStripI1.60 d1Smooth Rod Weld &Foam CoreC/T 193 sI1.80 d2Seam Weld CopperCorrugatorC/T 233 sI2.40 d3Outdoor Black PEOversheathC/T 304 sI1.40 d4N-Type / 4.3-10Solder EndC/T 222 sI0.90 d5VSWR <1.12 & PIMSweepC/T 171 sI1.80 dCUSTOMERCell TowerInstallations190 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Smooth Rod Weld & Foam Core193 s35 min94%99.2%285304 (1.60 d)254
2. Seam Weld Copper Corrugator233 s50 min91%98.5%285342 (1.80 d)200
3. Outdoor Black PE Oversheath304 s95 min83%96.4%380456 (2.40 d)135
4. N-Type / 4.3-10 Solder End222 s30 min93%98.7%190266 (1.40 d)216
5. VSWR <1.12 & PIM Sweep171 s12 min97%99.3%95171 (0.90 d)296

Key figures

Takt time
284 s
Lead time
9.92 d
Value-added time
1,123 s
Process cycle efficiency (PCE)
0.21%
Rolled throughput yield (RTY)
92.3%
Customer demand per day
190 units
Line capacity per day
135 units
Bottleneck
Outdoor Black PE Oversheath

Reading the bottleneck

The bottleneck is "Outdoor Black PE Oversheath": it can process 135 units per day against a demand of 190 units, so it falls short of demand by 29.1%. Once downtime and scrap are counted, its cycle time grows from 304 s to 380 s, against a takt of 284 s. The largest loss at this step is equipment downtime (uptime 83%), about 62.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.