80m Traveling Flat Halide-Free Lift Cable

Product family: Steel-Cord Reinforced Flat Cables.

Flow: Galvanized Support Strands → Parallel Element Grouping → Flat-Die TPE/PVC Extrusion → Central Steel Strain Cords → Pre-Cut Coil & Strain Loops → Continuous Flex & Continuity → High-Rise Elevator OEMs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 80m Traveling Flat Halide-Free Lift CableSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Galvanized Support Strands → Parallel Element Grouping (612 s) → Flat-Die TPE/PVC Extrusion (738 s) → Central Steel Strain Cords (963 s) → Pre-Cut Coil & Strain Loops (702 s) → Continuous Flex & Continuity (540 s) → High-Rise Elevator OEMs.SUPPLIERGalvanizedSupport StrandsI1.60 d1Parallel ElementGroupingC/T 612 sI1.80 d2Flat-Die TPE/PVCExtrusionC/T 738 sI2.40 d3Central SteelStrain CordsC/T 963 sI1.40 d4Pre-Cut Coil &Strain LoopsC/T 702 sI0.90 d5Continuous Flex &ContinuityC/T 540 sI1.80 dCUSTOMERHigh-RiseElevator OEMs60 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Parallel Element Grouping612 s35 min94%99.2%9096 (1.60 d)80
2. Flat-Die TPE/PVC Extrusion738 s50 min91%98.5%90108 (1.80 d)63
3. Central Steel Strain Cords963 s95 min83%96.4%120144 (2.40 d)42
4. Pre-Cut Coil & Strain Loops702 s30 min93%98.7%6084 (1.40 d)68
5. Continuous Flex & Continuity540 s12 min97%99.3%3054 (0.90 d)94

Key figures

Takt time
900 s
Lead time
9.97 d
Value-added time
3,555 s
Process cycle efficiency (PCE)
0.66%
Rolled throughput yield (RTY)
92.3%
Customer demand per day
60 units
Line capacity per day
42 units
Bottleneck
Central Steel Strain Cords

Reading the bottleneck

The bottleneck is "Central Steel Strain Cords": it can process 42 units per day against a demand of 60 units, so it falls short of demand by 29.2%. Once downtime and scrap are counted, its cycle time grows from 963 s to 1,204 s, against a takt of 900 s. The largest loss at this step is equipment downtime (uptime 83%), about 197 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.