10M-Flex Torsion Robotics Drag-Chain Cable
Product family: PUR Shielded Continuous Flex.
Flow: Ultra-Fine Strand Cu → Super-Fine Stranding & Tape → Short-Pitch Core Bundling → 85% Tinned Copper Braiding → High-Wear PUR Pressure Coat → 2-Million Bend-Radius Rig → CNC & Robotics OEMs
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Super-Fine Stranding & Tape | 540 s | 35 min | 94% | 99.2% | 102 | 109 (1.60 d) | 91 |
| 2. Short-Pitch Core Bundling | 651 s | 50 min | 91% | 98.5% | 102 | 122 (1.79 d) | 72 |
| 3. 85% Tinned Copper Braiding | 850 s | 95 min | 83% | 96.4% | 136 | 163 (2.40 d) | 48 |
| 4. High-Wear PUR Pressure Coat | 619 s | 30 min | 93% | 98.7% | 68 | 95 (1.40 d) | 77 |
| 5. 2-Million Bend-Radius Rig | 476 s | 12 min | 97% | 99.3% | 34 | 61 (0.90 d) | 106 |
Key figures
- Takt time
- 794 s
- Lead time
- 9.94 d
- Value-added time
- 3,136 s
- Process cycle efficiency (PCE)
- 0.58%
- Rolled throughput yield (RTY)
- 92.3%
- Customer demand per day
- 68 batches
- Line capacity per day
- 48 batches
- Bottleneck
- 85% Tinned Copper Braiding
Reading the bottleneck
The bottleneck is "85% Tinned Copper Braiding": it can process 48 batches per day against a demand of 68 batches, so it falls short of demand by 29.2%. Once downtime and scrap are counted, its cycle time grows from 850 s to 1,062 s, against a takt of 794 s. The largest loss at this step is equipment downtime (uptime 83%), about 174 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Power Cables & Fiber Extrusion: Power Cables & Fiber Extrusion
- 220kV Dynamic Offshore Wind Export Cable
- 33kV Underground Distribution AL/XLPE Cable
- 864-Fiber Loose-Tube Armored Backbone Cable
- 40Gbps Cat8 S/FTP Data Center Patch Trunk
- 1500V EN-50618 Cross-Linked Solar Cable
- Corrugated Copper 7/8" Low-Loss 5G Feeder
- 80m Traveling Flat Halide-Free Lift Cable
- NbTi Superconducting MRI Magnet Cryo Wire
- Laminated Silicone Rail Traction Busbar
- BS-6387 CWZ 950°C Mica Fire-Survival Cable
- Automated ICE/BEV Cockpit Wire Harness