Parabolic Concentrated Solar Thermal Facet Mirror
Product family: High-Reflectance Silvered Glass.
Flow: Low-Iron Bent Float Glass → CNC Gravity Heat Sag Bending → Chemical Silver & Copper Coat → 4-Layer Weather Paint Seal → Structural Al Backing Bond → Optical Laser Slope-Error QC → Solar Tower & Trough CSP
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. CNC Gravity Heat Sag Bending | 55.0 s | 20 min | 94% | 98.5% | 640 | 1,024 (1.60 d) | 889 |
| 2. Chemical Silver & Copper Coat | 68.0 s | 25 min | 91% | 96.4% | 512 | 960 (1.50 d) | 672 |
| 3. 4-Layer Weather Paint Seal | 90.0 s | 45 min | 85% | 92.0% | 384 | 1,408 (2.20 d) | 430 |
| 4. Structural Al Backing Bond | 62.0 s | 15 min | 95% | 97.5% | 256 | 640 (1.00 d) | 773 |
| 5. Optical Laser Slope-Error QC | 44.0 s | 8 min | 97% | 99.1% | 128 | 384 (0.60 d) | 1,127 |
Key figures
- Takt time
- 84.4 s
- Lead time
- 7.71 d
- Value-added time
- 319 s
- Process cycle efficiency (PCE)
- 0.077%
- Rolled throughput yield (RTY)
- 84.4%
- Customer demand per day
- 640 parts
- Line capacity per day
- 430 parts
- Bottleneck
- 4-Layer Weather Paint Seal
Reading the bottleneck
The bottleneck is "4-Layer Weather Paint Seal": it can process 430 parts per day against a demand of 640 parts, so it falls short of demand by 32.8%. Once downtime and scrap are counted, its cycle time grows from 90.0 s to 115 s, against a takt of 84.4 s. The largest loss at this step is equipment downtime (uptime 85%), about 15.9 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Solar PV, Wind, Hydrogen & BESS: Solar PV, Wind, Hydrogen & BESS
- Utility Solar PV Skid & Grid Commissioning
- 15MW Offshore Wind Turbine Nacelle Assembly
- 20MW PEM Green Hydrogen Electrolyzer Container
- 4MWh 20ft Utility BESS Battery Storage Container
- Biomethane RNG Anaerobic Digester & Membrane
- Offshore Rope-Access Wind Blade Leading-Edge Fix
- 120MW Francis Hydro Turbine Runner Overhaul
- Geothermal Binary Organic Rankine Cycle Plant
- HDPE Modular Floating Solar Reservoir Array
- Dual-Pillar Cantilever Commercial EV Solar Carport
- Factory SMR Nuclear Heat Exchanger Coil Module