Offshore Rope-Access Wind Blade Leading-Edge Fix

Product family: Zero-Erosion LEP Resin Repair.

Flow: Wind Leading-Edge Tape & Polyurethane → Drone HD Tip Erosion Survey → Rope Rig & Sanding Prep → Moisture Dry & Filler Putty → Infrared Blanket Epoxy Cure → LEP Tape & Ultrasonic Check → Wind Farm O&M Operators

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Offshore Rope-Access Wind Blade Leading-Edge FixSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Wind Leading-Edge Tape & Polyurethane → Drone HD Tip Erosion Survey (1,463 s) → Rope Rig & Sanding Prep (1,800 s) → Moisture Dry & Filler Putty (2,408 s) → Infrared Blanket Epoxy Cure (1,665 s) → LEP Tape & Ultrasonic Check (1,170 s) → Wind Farm O&M Operators.SUPPLIERWindLeading-EdgeTape &…I1.58 d1Drone HD TipErosion SurveyC/T 1,463 sI1.50 d2Rope Rig &Sanding PrepC/T 1,800 sI2.17 d3Moisture Dry &Filler PuttyC/T 2,408 sI1.00 d4Infrared BlanketEpoxy CureC/T 1,665 sI0.58 d5LEP Tape &Ultrasonic CheckC/T 1,170 sI0.83 dCUSTOMERWind Farm O&MOperators12 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Drone HD Tip Erosion Survey1,463 s20 min94%98.5%1219 (1.58 d)16
2. Rope Rig & Sanding Prep1,800 s25 min91%96.4%1018 (1.50 d)12
3. Moisture Dry & Filler Putty2,408 s45 min85%92.0%726 (2.17 d)7
4. Infrared Blanket Epoxy Cure1,665 s15 min95%97.5%512 (1.00 d)14
5. LEP Tape & Ultrasonic Check1,170 s8 min97%99.1%27 (0.58 d)20

Key figures

Takt time
2,250 s
Lead time
7.98 d
Value-added time
8,506 s
Process cycle efficiency (PCE)
3.9%
Rolled throughput yield (RTY)
84.4%
Customer demand per day
12 parts
Line capacity per day
7 parts
Bottleneck
Moisture Dry & Filler Putty

Reading the bottleneck

The bottleneck is "Moisture Dry & Filler Putty": it can process 7 parts per day against a demand of 12 parts, so it falls short of demand by 39.5%. Once downtime and scrap are counted, its cycle time grows from 2,408 s to 3,079 s, against a takt of 2,250 s. The largest loss at this step is equipment downtime (uptime 85%), about 425 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.