HDPE Modular Floating Solar Reservoir Array

Product family: Anchor-Moored Hydro-PV Floats.

Flow: Blow-Molded UV-HDPE Floats → Shoreline Pontoon Pin Latch → Walkway & Buoy Cable Tray → PV Panel Lock & Connector String → Barge Tow & Elastic Mooring → Floating Inverter Boat Tie → Water Reservoir Utilities

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: HDPE Modular Floating Solar Reservoir ArraySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Blow-Molded UV-HDPE Floats → Shoreline Pontoon Pin Latch (390 s) → Walkway & Buoy Cable Tray (480 s) → PV Panel Lock & Connector String (642 s) → Barge Tow & Elastic Mooring (444 s) → Floating Inverter Boat Tie (312 s) → Water Reservoir Utilities.SUPPLIERBlow-MoldedUV-HDPE FloatsI1.60 d1Shoreline PontoonPin LatchC/T 390 sI1.51 d2Walkway & BuoyCable TrayC/T 480 sI2.20 d3PV Panel Lock &Connector StringC/T 642 sI1.00 d4Barge Tow &Elastic MooringC/T 444 sI0.60 d5Floating InverterBoat TieC/T 312 sI0.80 dCUSTOMERWater ReservoirUtilities45 / skids

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Shoreline Pontoon Pin Latch390 s20 min94%98.5%4572 (1.60 d)61
2. Walkway & Buoy Cable Tray480 s25 min91%96.4%3668 (1.51 d)46
3. PV Panel Lock & Connector String642 s45 min85%92.0%2799 (2.20 d)27
4. Barge Tow & Elastic Mooring444 s15 min95%97.5%1845 (1.00 d)52
5. Floating Inverter Boat Tie312 s8 min97%99.1%927 (0.60 d)76

Key figures

Takt time
600 s
Lead time
7.80 d
Value-added time
2,268 s
Process cycle efficiency (PCE)
1.1%
Rolled throughput yield (RTY)
84.4%
Customer demand per day
45 skids
Line capacity per day
27 skids
Bottleneck
PV Panel Lock & Connector String

Reading the bottleneck

The bottleneck is "PV Panel Lock & Connector String": it can process 27 skids per day against a demand of 45 skids, so it falls short of demand by 39.1%. Once downtime and scrap are counted, its cycle time grows from 642 s to 821 s, against a takt of 600 s. The largest loss at this step is equipment downtime (uptime 85%), about 113 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.