Biomethane RNG Anaerobic Digester & Membrane

Product family: Agricultural Waste-to-Grid Gas.

Flow: Dairy Manure & Food Organics → Macerator & Pasteurizer Feed → 38°C Mesophilic Digester Tank → H2S Carbon Scrub & Drying → Hollow-Fiber CO2 Upgrading → Odorant Dose & Grid Injection → National Gas Pipeline Grid

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Biomethane RNG Anaerobic Digester & MembraneSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Dairy Manure & Food Organics → Macerator & Pasteurizer Feed (1,097 s) → 38°C Mesophilic Digester Tank (1,350 s) → H2S Carbon Scrub & Drying (1,806 s) → Hollow-Fiber CO2 Upgrading (1,249 s) → Odorant Dose & Grid Injection (878 s) → National Gas Pipeline Grid.SUPPLIERDairy Manure &Food OrganicsI1.60 d1Macerator &Pasteurizer FeedC/T 1,097 sI1.50 d238°C MesophilicDigester TankC/T 1,350 sI2.21 d3H2S Carbon Scrub& DryingC/T 1,806 sI1.00 d4Hollow-Fiber CO2UpgradingC/T 1,249 sI0.60 d5Odorant Dose &Grid InjectionC/T 878 sI0.79 dCUSTOMERNational GasPipeline Grid48 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Macerator & Pasteurizer Feed1,097 s20 min94%98.5%4877 (1.60 d)67
2. 38°C Mesophilic Digester Tank1,350 s25 min91%96.4%3872 (1.50 d)51
3. H2S Carbon Scrub & Drying1,806 s45 min85%92.0%29106 (2.21 d)33
4. Hollow-Fiber CO2 Upgrading1,249 s15 min95%97.5%1948 (1.00 d)58
5. Odorant Dose & Grid Injection878 s8 min97%99.1%1029 (0.60 d)86

Key figures

Takt time
1,688 s
Lead time
7.79 d
Value-added time
6,380 s
Process cycle efficiency (PCE)
1.0%
Rolled throughput yield (RTY)
84.4%
Customer demand per day
48 batches
Line capacity per day
33 batches
Bottleneck
H2S Carbon Scrub & Drying

Reading the bottleneck

The bottleneck is "H2S Carbon Scrub & Drying": it can process 33 batches per day against a demand of 48 batches, so it falls short of demand by 31.0%. Once downtime and scrap are counted, its cycle time grows from 1,806 s to 2,309 s, against a takt of 1,688 s. The largest loss at this step is equipment downtime (uptime 85%), about 319 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Solar PV, Wind, Hydrogen & BESS: Solar PV, Wind, Hydrogen & BESS