15MW Offshore Wind Turbine Nacelle Assembly

Product family: Direct-Drive Ocean Nacelles.

Flow: PM Generator & Yaw Ring OEMs → Bedplate & Shaft Frame Mount → Direct-Drive PM Generator → Cooling Heat-Exchanger & Crane → 66kV Switchgear & Back-to-Back → Quay Barge Load-Out → Offshore Quay Marshalling

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 15MW Offshore Wind Turbine Nacelle AssemblySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. PM Generator & Yaw Ring OEMs → Bedplate & Shaft Frame Mount (17,550 s) → Direct-Drive PM Generator (21,600 s) → Cooling Heat-Exchanger & Crane (28,890 s) → 66kV Switchgear & Back-to-Back (19,980 s) → Quay Barge Load-Out (14,040 s) → Offshore Quay Marshalling.SUPPLIERPM Generator &Yaw Ring OEMsI1.50 d1Bedplate & ShaftFrame MountC/T 17,550 sI1.50 d2Direct-Drive PMGeneratorC/T 21,600 sI2.00 d3CoolingHeat-Exchanger &…C/T 28,890 sI1.00 d466kV Switchgear &Back-to-BackC/T 19,980 sI0.50 d5Quay BargeLoad-OutC/T 14,040 sI1.00 dCUSTOMEROffshore QuayMarshalling2 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Bedplate & Shaft Frame Mount17,550 s20 min94%98.5%23 (1.50 d)3
2. Direct-Drive PM Generator21,600 s25 min91%96.4%23 (1.50 d)2
3. Cooling Heat-Exchanger & Crane28,890 s45 min85%92.0%14 (2.00 d)1
4. 66kV Switchgear & Back-to-Back19,980 s15 min95%97.5%12 (1.00 d)2
5. Quay Barge Load-Out14,040 s8 min97%99.1%11 (0.50 d)4

Key figures

Takt time
27,000 s
Lead time
9.39 d
Value-added time
102,060 s
Process cycle efficiency (PCE)
20.1%
Rolled throughput yield (RTY)
84.4%
Customer demand per day
2 units
Line capacity per day
1 units
Bottleneck
Cooling Heat-Exchanger & Crane

Reading the bottleneck

The bottleneck is "Cooling Heat-Exchanger & Crane": it can process 1 units per day against a demand of 2 units, so it falls short of demand by 28.7%. Once downtime and scrap are counted, its cycle time grows from 28,890 s to 36,944 s, against a takt of 27,000 s. The largest loss at this step is equipment downtime (uptime 85%), about 5,098 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.