Dual-Pillar Cantilever Commercial EV Solar Carport

Product family: Shaded Workplace Solar Charge.

Flow: Hot-Dip Galv Steel & Bifacial → Helical Pile / Concrete Pier → Cantilever Steel Arm Bolt-Up → Translucent Bifacial Glass Seal → Under-Deck Conduit & Wallbox → Dynamic Solar-EV Load Balance → Supermarket & Office Lots

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Dual-Pillar Cantilever Commercial EV Solar CarportSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Hot-Dip Galv Steel & Bifacial → Helical Pile / Concrete Pier (1,097 s) → Cantilever Steel Arm Bolt-Up (1,350 s) → Translucent Bifacial Glass Seal (1,806 s) → Under-Deck Conduit & Wallbox (1,249 s) → Dynamic Solar-EV Load Balance (878 s) → Supermarket & Office Lots.SUPPLIERHot-Dip GalvSteel &BifacialI1.63 d1Helical Pile /Concrete PierC/T 1,097 sI1.50 d2Cantilever SteelArm Bolt-UpC/T 1,350 sI2.19 d3TranslucentBifacial Glass…C/T 1,806 sI1.00 d4Under-DeckConduit & WallboxC/T 1,249 sI0.63 d5Dynamic Solar-EVLoad BalanceC/T 878 sI0.81 dCUSTOMERSupermarket &Office Lots16 / skids

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Helical Pile / Concrete Pier1,097 s20 min94%98.5%1626 (1.63 d)22
2. Cantilever Steel Arm Bolt-Up1,350 s25 min91%96.4%1324 (1.50 d)16
3. Translucent Bifacial Glass Seal1,806 s45 min85%92.0%1035 (2.19 d)10
4. Under-Deck Conduit & Wallbox1,249 s15 min95%97.5%616 (1.00 d)18
5. Dynamic Solar-EV Load Balance878 s8 min97%99.1%310 (0.63 d)27

Key figures

Takt time
1,688 s
Lead time
7.99 d
Value-added time
6,380 s
Process cycle efficiency (PCE)
3.0%
Rolled throughput yield (RTY)
84.4%
Customer demand per day
16 skids
Line capacity per day
10 skids
Bottleneck
Translucent Bifacial Glass Seal

Reading the bottleneck

The bottleneck is "Translucent Bifacial Glass Seal": it can process 10 skids per day against a demand of 16 skids, so it falls short of demand by 38.6%. Once downtime and scrap are counted, its cycle time grows from 1,806 s to 2,309 s, against a takt of 1,688 s. The largest loss at this step is equipment downtime (uptime 85%), about 319 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.