Factory SMR Nuclear Heat Exchanger Coil Module

Product family: NQA-1 Compact Steam Gen.

Flow: Alloy 690 Seamless Tubes → Cleanroom Alloy-690 Helical Wind → Robot TIG Tube-to-Sheet Weld → 100% Helium Mass-Spec Scan → ASME Sec-III Hydro & Stamping → Heavy Skid Nitrogen Sealed → Next-Gen Clean Nuclear

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Factory SMR Nuclear Heat Exchanger Coil ModuleSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Alloy 690 Seamless Tubes → Cleanroom Alloy-690 Helical Wind (17,550 s) → Robot TIG Tube-to-Sheet Weld (21,600 s) → 100% Helium Mass-Spec Scan (28,890 s) → ASME Sec-III Hydro & Stamping (19,980 s) → Heavy Skid Nitrogen Sealed (14,040 s) → Next-Gen Clean Nuclear.SUPPLIERAlloy 690Seamless TubesI1.50 d1CleanroomAlloy-690 Helica…C/T 17,550 sI1.50 d2Robot TIGTube-to-Sheet…C/T 21,600 sI2.00 d3100% HeliumMass-Spec ScanC/T 28,890 sI1.00 d4ASME Sec-IIIHydro & StampingC/T 19,980 sI0.50 d5Heavy SkidNitrogen SealedC/T 14,040 sI1.00 dCUSTOMERNext-Gen CleanNuclear2 / modules

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Cleanroom Alloy-690 Helical Wind17,550 s20 min94%98.5%23 (1.50 d)3
2. Robot TIG Tube-to-Sheet Weld21,600 s25 min91%96.4%23 (1.50 d)2
3. 100% Helium Mass-Spec Scan28,890 s45 min85%92.0%14 (2.00 d)1
4. ASME Sec-III Hydro & Stamping19,980 s15 min95%97.5%12 (1.00 d)2
5. Heavy Skid Nitrogen Sealed14,040 s8 min97%99.1%11 (0.50 d)4

Key figures

Takt time
27,000 s
Lead time
9.39 d
Value-added time
102,060 s
Process cycle efficiency (PCE)
20.1%
Rolled throughput yield (RTY)
84.4%
Customer demand per day
2 modules
Line capacity per day
1 modules
Bottleneck
100% Helium Mass-Spec Scan

Reading the bottleneck

The bottleneck is "100% Helium Mass-Spec Scan": it can process 1 modules per day against a demand of 2 modules, so it falls short of demand by 28.7%. Once downtime and scrap are counted, its cycle time grows from 28,890 s to 36,944 s, against a takt of 27,000 s. The largest loss at this step is equipment downtime (uptime 85%), about 5,098 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Solar PV, Wind, Hydrogen & BESS: Solar PV, Wind, Hydrogen & BESS