20MW PEM Green Hydrogen Electrolyzer Container

Product family: Modular H2 Production Skids.

Flow: PEM Stacks & Titanium Plates → Skid Frame & DI Water Loop → PEM Cell-Stack Compression → Gas-Water Separator & Dryer → ATEX Leak & Rectifier Load → High-Purity H2 Cert Sign → Steel & Ammonia Offtakers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 20MW PEM Green Hydrogen Electrolyzer ContainerSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. PEM Stacks & Titanium Plates → Skid Frame & DI Water Loop (8,775 s) → PEM Cell-Stack Compression (10,800 s) → Gas-Water Separator & Dryer (14,445 s) → ATEX Leak & Rectifier Load (9,990 s) → High-Purity H2 Cert Sign (7,020 s) → Steel & Ammonia Offtakers.SUPPLIERPEM Stacks &Titanium PlatesI1.50 d1Skid Frame & DIWater LoopC/T 8,775 sI1.50 d2PEM Cell-StackCompressionC/T 10,800 sI2.25 d3Gas-WaterSeparator & DryerC/T 14,445 sI1.00 d4ATEX Leak &Rectifier LoadC/T 9,990 sI0.50 d5High-Purity H2Cert SignC/T 7,020 sI0.75 dCUSTOMERSteel & AmmoniaOfftakers4 / skids

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Skid Frame & DI Water Loop8,775 s20 min94%98.5%46 (1.50 d)6
2. PEM Cell-Stack Compression10,800 s25 min91%96.4%36 (1.50 d)4
3. Gas-Water Separator & Dryer14,445 s45 min85%92.0%29 (2.25 d)3
4. ATEX Leak & Rectifier Load9,990 s15 min95%97.5%24 (1.00 d)5
5. High-Purity H2 Cert Sign7,020 s8 min97%99.1%12 (0.50 d)7

Key figures

Takt time
13,500 s
Lead time
8.45 d
Value-added time
51,030 s
Process cycle efficiency (PCE)
11.2%
Rolled throughput yield (RTY)
84.4%
Customer demand per day
4 skids
Line capacity per day
3 skids
Bottleneck
Gas-Water Separator & Dryer

Reading the bottleneck

The bottleneck is "Gas-Water Separator & Dryer": it can process 3 skids per day against a demand of 4 skids, so it falls short of demand by 34.2%. Once downtime and scrap are counted, its cycle time grows from 14,445 s to 18,472 s, against a takt of 13,500 s. The largest loss at this step is equipment downtime (uptime 85%), about 2,549 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.