4MWh 20ft Utility BESS Battery Storage Container
Product family: Turnkey Grid-Forming BESS.
Flow: 314Ah LFP Pack Factories → Insulated ISO Shell & Aerosol FSS → Liquid-Cool Floor Manifold Pipe → 12-Rack LFP Module Slide-In → EMS Edge Controller & Fiber → 1500V DC HiPot & Charge Run → Grid Frequency Utilities
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Insulated ISO Shell & Aerosol FSS | 4,388 s | 20 min | 94% | 98.5% | 8 | 13 (1.63 d) | 11 |
| 2. Liquid-Cool Floor Manifold Pipe | 5,400 s | 25 min | 91% | 96.4% | 6 | 12 (1.50 d) | 8 |
| 3. 12-Rack LFP Module Slide-In | 7,223 s | 45 min | 85% | 92.0% | 5 | 18 (2.25 d) | 5 |
| 4. EMS Edge Controller & Fiber | 4,995 s | 15 min | 95% | 97.5% | 3 | 8 (1.00 d) | 10 |
| 5. 1500V DC HiPot & Charge Run | 3,510 s | 8 min | 97% | 99.1% | 2 | 5 (0.63 d) | 14 |
Key figures
- Takt time
- 6,750 s
- Lead time
- 8.22 d
- Value-added time
- 25,516 s
- Process cycle efficiency (PCE)
- 5.7%
- Rolled throughput yield (RTY)
- 84.4%
- Customer demand per day
- 8 TEU
- Line capacity per day
- 5 TEU
- Bottleneck
- 12-Rack LFP Module Slide-In
Reading the bottleneck
The bottleneck is "12-Rack LFP Module Slide-In": it can process 5 TEU per day against a demand of 8 TEU, so it falls short of demand by 32.8%. Once downtime and scrap are counted, its cycle time grows from 7,223 s to 9,237 s, against a takt of 6,750 s. The largest loss at this step is equipment downtime (uptime 85%), about 1,275 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Solar PV, Wind, Hydrogen & BESS: Solar PV, Wind, Hydrogen & BESS
- Utility Solar PV Skid & Grid Commissioning
- 15MW Offshore Wind Turbine Nacelle Assembly
- 20MW PEM Green Hydrogen Electrolyzer Container
- Biomethane RNG Anaerobic Digester & Membrane
- Offshore Rope-Access Wind Blade Leading-Edge Fix
- Parabolic Concentrated Solar Thermal Facet Mirror
- 120MW Francis Hydro Turbine Runner Overhaul