Geothermal Binary Organic Rankine Cycle Plant
Product family: Baseload Heat-to-Power Loop.
Flow: 210°C Deep Brine Wells → Brine Heat-Exchanger Descale → Working Fluid Evaporator Boil → Axial Supersonic ORC Turbine → Air/Water Condenser Loop → Grid Synchronization Load → Baseload Regional Grid
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Brine Heat-Exchanger Descale | 2,925 s | 20 min | 94% | 98.5% | 18 | 29 (1.61 d) | 25 |
| 2. Working Fluid Evaporator Boil | 3,600 s | 25 min | 91% | 96.4% | 14 | 27 (1.50 d) | 19 |
| 3. Axial Supersonic ORC Turbine | 4,815 s | 45 min | 85% | 92.0% | 11 | 40 (2.22 d) | 12 |
| 4. Air/Water Condenser Loop | 3,330 s | 15 min | 95% | 97.5% | 7 | 18 (1.00 d) | 22 |
| 5. Grid Synchronization Load | 2,340 s | 8 min | 97% | 99.1% | 4 | 11 (0.61 d) | 32 |
Key figures
- Takt time
- 4,500 s
- Lead time
- 7.93 d
- Value-added time
- 17,010 s
- Process cycle efficiency (PCE)
- 2.6%
- Rolled throughput yield (RTY)
- 84.4%
- Customer demand per day
- 18 batches
- Line capacity per day
- 12 batches
- Bottleneck
- Axial Supersonic ORC Turbine
Reading the bottleneck
The bottleneck is "Axial Supersonic ORC Turbine": it can process 12 batches per day against a demand of 18 batches, so it falls short of demand by 30.9%. Once downtime and scrap are counted, its cycle time grows from 4,815 s to 6,157 s, against a takt of 4,500 s. The largest loss at this step is equipment downtime (uptime 85%), about 850 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Solar PV, Wind, Hydrogen & BESS: Solar PV, Wind, Hydrogen & BESS
- Utility Solar PV Skid & Grid Commissioning
- 15MW Offshore Wind Turbine Nacelle Assembly
- 20MW PEM Green Hydrogen Electrolyzer Container
- 4MWh 20ft Utility BESS Battery Storage Container
- Biomethane RNG Anaerobic Digester & Membrane
- Offshore Rope-Access Wind Blade Leading-Edge Fix
- Parabolic Concentrated Solar Thermal Facet Mirror
- 120MW Francis Hydro Turbine Runner Overhaul
- HDPE Modular Floating Solar Reservoir Array
- Dual-Pillar Cantilever Commercial EV Solar Carport
- Factory SMR Nuclear Heat Exchanger Coil Module