Xylitol Sugar-Free Dragee Gum Blister Line

Product family: Coated Peppermint Blister Packs.

Flow: Food-Grade Gum Base & Xylitol → Kneader Extrude & Sheet Roll → 72h Conditioning Room & Break → 20-Pass Revolving Coating Pan → Carnauba Shine Polish Tumbler → Blister Seal & Flip-Box Pack → Checkout & Pharmacy Impulse

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Xylitol Sugar-Free Dragee Gum Blister LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Food-Grade Gum Base & Xylitol → Kneader Extrude & Sheet Roll (1.2 s) → 72h Conditioning Room & Break (1.2 s) → 20-Pass Revolving Coating Pan (1.2 s) → Carnauba Shine Polish Tumbler (1.2 s) → Blister Seal & Flip-Box Pack (1.2 s) → Checkout & Pharmacy Impulse.SUPPLIERFood-Grade GumBase & XylitolI0.90 d1Kneader Extrude &Sheet RollC/T 1.2 sI1.00 d272h ConditioningRoom & BreakC/T 1.2 sI1.30 d320-Pass RevolvingCoating PanC/T 1.2 sI0.80 d4Carnauba ShinePolish TumblerC/T 1.2 sI0.70 d5Blister Seal &Flip-Box PackC/T 1.2 sI1.20 dCUSTOMERCheckout &Pharmacy…95,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Kneader Extrude & Sheet Roll1.2 s25 min95%99.0%57,00085,500 (0.90 d)61,524
2. 72h Conditioning Room & Break1.2 s30 min92%98.1%47,50095,000 (1.00 d)58,213
3. 20-Pass Revolving Coating Pan1.2 s45 min85%96.4%76,000123,500 (1.30 d)53,005
4. Carnauba Shine Polish Tumbler1.2 s12 min94%98.6%28,50076,000 (0.80 d)60,708
5. Blister Seal & Flip-Box Pack1.2 s18 min93%99.2%28,50066,500 (0.70 d)59,505

Key figures

Takt time
0.9 s
Lead time
5.90 d
Value-added time
6.0 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
91.6%
Customer demand per day
95,000 packs
Line capacity per day
53,005 packs
Bottleneck
20-Pass Revolving Coating Pan

Reading the bottleneck

The bottleneck is "20-Pass Revolving Coating Pan": it can process 53,005 packs per day against a demand of 95,000 packs, so it falls short of demand by 44.2%. Once downtime and scrap are counted, its cycle time grows from 1.2 s to 1.5 s, against a takt of 0.9 s. The largest loss at this step is equipment downtime (uptime 85%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Bakery, Biscuits & Confectionery: Bakery, Biscuits & Confectionery