27-Layer Butter-Laminated Frozen Croissant Line

Product family: Ready-to-Prove Butter Pastries.

Flow: AOP Cultured Roll-In Butter → Dough Sheet & Butter Lock-In → Triple Stress-Free Cross Lamination → Triangular Guillotine & Curl → -38°C Tunnel Shock Freeze → Weight Sort & Bulk Liner Case → Hotels & Bakery Chains

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 27-Layer Butter-Laminated Frozen Croissant LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. AOP Cultured Roll-In Butter → Dough Sheet & Butter Lock-In (1.2 s) → Triple Stress-Free Cross Lamination (1.2 s) → Triangular Guillotine & Curl (1.3 s) → -38°C Tunnel Shock Freeze (1.2 s) → Weight Sort & Bulk Liner Case (1.2 s) → Hotels & Bakery Chains.SUPPLIERAOP CulturedRoll-In ButterI0.90 d1Dough Sheet &Butter Lock-InC/T 1.2 sI1.00 d2TripleStress-Free Cros…C/T 1.2 sI1.30 d3TriangularGuillotine & CurlC/T 1.3 sI0.80 d4-38°C TunnelShock FreezeC/T 1.2 sI0.70 d5Weight Sort &Bulk Liner CaseC/T 1.2 sI1.20 dCUSTOMERHotels & BakeryChains45,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Dough Sheet & Butter Lock-In1.2 s25 min95%99.0%27,00040,500 (0.90 d)40,363
2. Triple Stress-Free Cross Lamination1.2 s30 min92%98.1%22,50045,000 (1.00 d)37,906
3. Triangular Guillotine & Curl1.3 s45 min85%96.4%36,00058,500 (1.30 d)31,909
4. -38°C Tunnel Shock Freeze1.2 s12 min94%98.6%13,50036,000 (0.80 d)39,854
5. Weight Sort & Bulk Liner Case1.2 s18 min93%99.2%13,50031,500 (0.70 d)38,748

Key figures

Takt time
1.2 s
Lead time
5.90 d
Value-added time
6.1 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
91.6%
Customer demand per day
45,000 units
Line capacity per day
31,909 units
Bottleneck
Triangular Guillotine & Curl

Reading the bottleneck

The bottleneck is "Triangular Guillotine & Curl": it can process 31,909 units per day against a demand of 45,000 units, so it falls short of demand by 29.1%. Once downtime and scrap are counted, its cycle time grows from 1.3 s to 1.6 s, against a takt of 1.2 s. The largest loss at this step is equipment downtime (uptime 85%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.