Almond-Meringue Luxury Filled Macaron Line

Product family: Nitrogen-Packed Frozen Boxes.

Flow: Blanched Spanish Almond Flour → Fine Screen Whipped Macaronage → Multi-Nozzle Tray Deposit → 30m Deck Bake & Shell Pair → Ganache Core Deposit & Cap → Liquid-N2 Crust Freeze & Tray → Luxury Bakeries & Airlines

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Almond-Meringue Luxury Filled Macaron LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Blanched Spanish Almond Flour → Fine Screen Whipped Macaronage (2.3 s) → Multi-Nozzle Tray Deposit (2.8 s) → 30m Deck Bake & Shell Pair (3.6 s) → Ganache Core Deposit & Cap (2.6 s) → Liquid-N2 Crust Freeze & Tray (2.2 s) → Luxury Bakeries & Airlines.SUPPLIERBlanchedSpanish AlmondFlourI0.90 d1Fine ScreenWhipped…C/T 2.3 sI1.00 d2Multi-Nozzle TrayDepositC/T 2.8 sI1.30 d330m Deck Bake &Shell PairC/T 3.6 sI0.80 d4Ganache CoreDeposit & CapC/T 2.6 sI0.70 d5Liquid-N2 CrustFreeze & TrayC/T 2.2 sI1.20 dCUSTOMERLuxury Bakeries& Airlines16,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Fine Screen Whipped Macaronage2.3 s25 min95%99.0%9,60014,400 (0.90 d)21,059
2. Multi-Nozzle Tray Deposit2.8 s30 min92%98.1%8,00016,000 (1.00 d)16,245
3. 30m Deck Bake & Shell Pair3.6 s45 min85%96.4%12,80020,800 (1.30 d)11,523
4. Ganache Core Deposit & Cap2.6 s12 min94%98.6%4,80012,800 (0.80 d)18,394
5. Liquid-N2 Crust Freeze & Tray2.2 s18 min93%99.2%4,80011,200 (0.70 d)21,135

Key figures

Takt time
3.4 s
Lead time
5.90 d
Value-added time
13.5 s
Process cycle efficiency (PCE)
0.004%
Rolled throughput yield (RTY)
91.6%
Customer demand per day
16,000 packs
Line capacity per day
11,523 packs
Bottleneck
30m Deck Bake & Shell Pair

Reading the bottleneck

The bottleneck is "30m Deck Bake & Shell Pair": it can process 11,523 packs per day against a demand of 16,000 packs, so it falls short of demand by 28.0%. Once downtime and scrap are counted, its cycle time grows from 3.6 s to 4.4 s, against a takt of 3.4 s. The largest loss at this step is equipment downtime (uptime 85%), about 0.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.