Natural Sourdough 48h Slow-Ferment Panettone

Product family: Artisanal Holiday Cake Boxes.

Flow: Lievito Madre Starter → 3-Stage Lievito Madre Dough → Cup Paper Mold 14h Proof → Rack Hearth Bake & Skewer Hang → 12h Upside-Down Cool Rack → Cellophane Tie & Ribbon Box → Specialty Retail & Export

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Natural Sourdough 48h Slow-Ferment PanettoneSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Lievito Madre Starter → 3-Stage Lievito Madre Dough (5.7 s) → Cup Paper Mold 14h Proof (6.9 s) → Rack Hearth Bake & Skewer Hang (8.9 s) → 12h Upside-Down Cool Rack (6.6 s) → Cellophane Tie & Ribbon Box (5.4 s) → Specialty Retail & Export.SUPPLIERLievito MadreStarterI0.90 d13-Stage LievitoMadre DoughC/T 5.7 sI1.00 d2Cup Paper Mold14h ProofC/T 6.9 sI1.30 d3Rack Hearth Bake& Skewer HangC/T 8.9 sI0.80 d412h Upside-DownCool RackC/T 6.6 sI0.70 d5Cellophane Tie &Ribbon BoxC/T 5.4 sI1.20 dCUSTOMERSpecialtyRetail & Export6,400 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 3-Stage Lievito Madre Dough5.7 s25 min95%99.0%3,8405,760 (0.90 d)8,498
2. Cup Paper Mold 14h Proof6.9 s30 min92%98.1%3,2006,400 (1.00 d)6,592
3. Rack Hearth Bake & Skewer Hang8.9 s45 min85%96.4%5,1208,320 (1.30 d)4,661
4. 12h Upside-Down Cool Rack6.6 s12 min94%98.6%1,9205,120 (0.80 d)7,246
5. Cellophane Tie & Ribbon Box5.4 s18 min93%99.2%1,9204,480 (0.70 d)8,611

Key figures

Takt time
8.4 s
Lead time
5.90 d
Value-added time
33.5 s
Process cycle efficiency (PCE)
0.011%
Rolled throughput yield (RTY)
91.6%
Customer demand per day
6,400 packs
Line capacity per day
4,661 packs
Bottleneck
Rack Hearth Bake & Skewer Hang

Reading the bottleneck

The bottleneck is "Rack Hearth Bake & Skewer Hang": it can process 4,661 packs per day against a demand of 6,400 packs, so it falls short of demand by 27.2%. Once downtime and scrap are counted, its cycle time grows from 8.9 s to 10.9 s, against a takt of 8.4 s. The largest loss at this step is equipment downtime (uptime 85%), about 1.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Bakery, Biscuits & Confectionery: Bakery, Biscuits & Confectionery