Dedicated Allergen-Free Rotary Biscuit Line

Product family: Gluten-Free Oat Crunch Packs.

Flow: Certified GF Oat & Rice → Segregated Silo Batch Mix → Rotary Die & Wire-Cut Form → Direct-Gas Band Oven Bake → On-Edge Slug Stack Cooler → ELISA Lot Audit & Flowpack → Free-From Grocery Aisles

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Dedicated Allergen-Free Rotary Biscuit LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Certified GF Oat & Rice → Segregated Silo Batch Mix (2.0 s) → Rotary Die & Wire-Cut Form (2.5 s) → Direct-Gas Band Oven Bake (3.2 s) → On-Edge Slug Stack Cooler (2.3 s) → ELISA Lot Audit & Flowpack (1.9 s) → Free-From Grocery Aisles.SUPPLIERCertified GFOat & RiceI0.90 d1Segregated SiloBatch MixC/T 2.0 sI1.00 d2Rotary Die &Wire-Cut FormC/T 2.5 sI1.30 d3Direct-Gas BandOven BakeC/T 3.2 sI0.80 d4On-Edge SlugStack CoolerC/T 2.3 sI0.70 d5ELISA Lot Audit &FlowpackC/T 1.9 sI1.20 dCUSTOMERFree-FromGrocery Aisles18,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Segregated Silo Batch Mix2.0 s25 min95%99.0%10,80016,200 (0.90 d)24,218
2. Rotary Die & Wire-Cut Form2.5 s30 min92%98.1%9,00018,000 (1.00 d)18,195
3. Direct-Gas Band Oven Bake3.2 s45 min85%96.4%14,40023,400 (1.30 d)12,963
4. On-Edge Slug Stack Cooler2.3 s12 min94%98.6%5,40014,400 (0.80 d)20,793
5. ELISA Lot Audit & Flowpack1.9 s18 min93%99.2%5,40012,600 (0.70 d)24,472

Key figures

Takt time
3.0 s
Lead time
5.90 d
Value-added time
11.9 s
Process cycle efficiency (PCE)
0.004%
Rolled throughput yield (RTY)
91.6%
Customer demand per day
18,000 packs
Line capacity per day
12,963 packs
Bottleneck
Direct-Gas Band Oven Bake

Reading the bottleneck

The bottleneck is "Direct-Gas Band Oven Bake": it can process 12,963 packs per day against a demand of 18,000 packs, so it falls short of demand by 28.0%. Once downtime and scrap are counted, its cycle time grows from 3.2 s to 3.9 s, against a takt of 3.0 s. The largest loss at this step is equipment downtime (uptime 85%), about 0.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.