Par-Baked Frozen French Baguette Spiral Tunnel

Product family: 250g Bake-Off Retail Baguettes.

Flow: T65 Stoneground Flour → Gentle Autolyse & Divide → 18h Cold Retard Chamber → Stone-Deck Steam Partial Bake → -35°C Spiral Nitrogen Freeze → Auto Case-Lined Bag & -20°C → In-Store Bakery Supermarkets

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Par-Baked Frozen French Baguette Spiral TunnelSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. T65 Stoneground Flour → Gentle Autolyse & Divide (2.1 s) → 18h Cold Retard Chamber (2.6 s) → Stone-Deck Steam Partial Bake (3.3 s) → -35°C Spiral Nitrogen Freeze (2.4 s) → Auto Case-Lined Bag & -20°C (2.0 s) → In-Store Bakery Supermarkets.SUPPLIERT65 StonegroundFlourI0.90 d1Gentle Autolyse &DivideC/T 2.1 sI1.00 d218h Cold RetardChamberC/T 2.6 sI1.30 d3Stone-Deck SteamPartial BakeC/T 3.3 sI0.80 d4-35°C SpiralNitrogen FreezeC/T 2.4 sI0.70 d5Auto Case-LinedBag & -20°CC/T 2.0 sI1.20 dCUSTOMERIn-Store BakerySupermarkets26,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Gentle Autolyse & Divide2.1 s25 min95%99.0%15,60023,400 (0.90 d)35,157
2. 18h Cold Retard Chamber2.6 s30 min92%98.1%13,00026,000 (1.00 d)26,867
3. Stone-Deck Steam Partial Bake3.3 s45 min85%96.4%20,80033,800 (1.30 d)19,275
4. -35°C Spiral Nitrogen Freeze2.4 s12 min94%98.6%7,80020,800 (0.80 d)30,354
5. Auto Case-Lined Bag & -20°C2.0 s18 min93%99.2%7,80018,200 (0.70 d)35,703

Key figures

Takt time
3.1 s
Lead time
5.90 d
Value-added time
12.4 s
Process cycle efficiency (PCE)
0.003%
Rolled throughput yield (RTY)
91.6%
Customer demand per day
26,000 packs
Line capacity per day
19,275 packs
Bottleneck
Stone-Deck Steam Partial Bake

Reading the bottleneck

The bottleneck is "Stone-Deck Steam Partial Bake": it can process 19,275 packs per day against a demand of 26,000 packs, so it falls short of demand by 25.9%. Once downtime and scrap are counted, its cycle time grows from 3.3 s to 4.0 s, against a takt of 3.1 s. The largest loss at this step is equipment downtime (uptime 85%), about 0.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Bakery, Biscuits & Confectionery: Bakery, Biscuits & Confectionery