Multi-Tier Cream Wafer Baking & Enrobing Line

Product family: Hazelnut Chocolate Wafers.

Flow: Hazelnut Paste & Wheat → 96-Plate Gas Wafer Oven → Conditioning Tunnel & Cream → Ultrasonic Piano Wire Cut → Dark Choc Waterfall Enrobe → 200-bpm Flowpack Wrapper → Retail & Impulse Channels

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Multi-Tier Cream Wafer Baking & Enrobing LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Hazelnut Paste & Wheat → 96-Plate Gas Wafer Oven (1.4 s) → Conditioning Tunnel & Cream (1.7 s) → Ultrasonic Piano Wire Cut (2.3 s) → Dark Choc Waterfall Enrobe (1.7 s) → 200-bpm Flowpack Wrapper (1.4 s) → Retail & Impulse Channels.SUPPLIERHazelnut Paste& WheatI0.90 d196-Plate GasWafer OvenC/T 1.4 sI1.00 d2ConditioningTunnel & CreamC/T 1.7 sI1.30 d3Ultrasonic PianoWire CutC/T 2.3 sI0.80 d4Dark ChocWaterfall EnrobeC/T 1.7 sI0.70 d5200-bpm FlowpackWrapperC/T 1.4 sI1.20 dCUSTOMERRetail &Impulse…38,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 96-Plate Gas Wafer Oven1.4 s25 min95%99.0%22,80034,200 (0.90 d)52,735
2. Conditioning Tunnel & Cream1.7 s30 min92%98.1%19,00038,000 (1.00 d)41,091
3. Ultrasonic Piano Wire Cut2.3 s45 min85%96.4%30,40049,400 (1.30 d)27,655
4. Dark Choc Waterfall Enrobe1.7 s12 min94%98.6%11,40030,400 (0.80 d)42,853
5. 200-bpm Flowpack Wrapper1.4 s18 min93%99.2%11,40026,600 (0.70 d)51,004

Key figures

Takt time
2.1 s
Lead time
5.90 d
Value-added time
8.5 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
91.6%
Customer demand per day
38,000 packs
Line capacity per day
27,655 packs
Bottleneck
Ultrasonic Piano Wire Cut

Reading the bottleneck

The bottleneck is "Ultrasonic Piano Wire Cut": it can process 27,655 packs per day against a demand of 38,000 packs, so it falls short of demand by 27.2%. Once downtime and scrap are counted, its cycle time grows from 2.3 s to 2.8 s, against a takt of 2.1 s. The largest loss at this step is equipment downtime (uptime 85%), about 0.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Bakery, Biscuits & Confectionery: Bakery, Biscuits & Confectionery