Twin-Screw Extruded Multigrain Cereal Line

Product family: 500g Bag-in-Box Breakfast.

Flow: Whole Corn, Rice & Honey → Pressure Steam Cook Batch → Tempering Bin & Heavy Flake → Toasting Impingement Oven → Honey Coat Drum & Cooling → Vertical Bag & Carton Box → National Supermarkets

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Twin-Screw Extruded Multigrain Cereal LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Whole Corn, Rice & Honey → Pressure Steam Cook Batch (1.7 s) → Tempering Bin & Heavy Flake (2.1 s) → Toasting Impingement Oven (2.7 s) → Honey Coat Drum & Cooling (2.0 s) → Vertical Bag & Carton Box (1.6 s) → National Supermarkets.SUPPLIERWhole Corn,Rice & HoneyI0.90 d1Pressure SteamCook BatchC/T 1.7 sI1.00 d2Tempering Bin &Heavy FlakeC/T 2.1 sI1.30 d3ToastingImpingement OvenC/T 2.7 sI0.80 d4Honey Coat Drum &CoolingC/T 2.0 sI0.70 d5Vertical Bag &Carton BoxC/T 1.6 sI1.20 dCUSTOMERNationalSupermarkets21,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Pressure Steam Cook Batch1.7 s25 min95%99.0%12,60018,900 (0.90 d)28,492
2. Tempering Bin & Heavy Flake2.1 s30 min92%98.1%10,50021,000 (1.00 d)21,660
3. Toasting Impingement Oven2.7 s45 min85%96.4%16,80027,300 (1.30 d)15,364
4. Honey Coat Drum & Cooling2.0 s12 min94%98.6%6,30016,800 (0.80 d)23,912
5. Vertical Bag & Carton Box1.6 s18 min93%99.2%6,30014,700 (0.70 d)29,061

Key figures

Takt time
2.6 s
Lead time
5.90 d
Value-added time
10.1 s
Process cycle efficiency (PCE)
0.003%
Rolled throughput yield (RTY)
91.6%
Customer demand per day
21,000 packs
Line capacity per day
15,364 packs
Bottleneck
Toasting Impingement Oven

Reading the bottleneck

The bottleneck is "Toasting Impingement Oven": it can process 15,364 packs per day against a demand of 21,000 packs, so it falls short of demand by 26.8%. Once downtime and scrap are counted, its cycle time grows from 2.7 s to 3.3 s, against a takt of 2.6 s. The largest loss at this step is equipment downtime (uptime 85%), about 0.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.