Hot-Press Corn & Wheat Tortilla 12-Row Line

Product family: 30cm Burrito Tortilla Wraps.

Flow: Nixtamalized Masa & Flour → High-Speed Hydrated Masa Mix → Thermal Platens Dual Hot-Press → 3-Tier Flame Impinge Bake → 7-Pass Ambient Cool Rack → Auto Count, Bag & Heat Seal → Retail & Tex-Mex Foodservice

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Hot-Press Corn & Wheat Tortilla 12-Row LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Nixtamalized Masa & Flour → High-Speed Hydrated Masa Mix (1.2 s) → Thermal Platens Dual Hot-Press (1.2 s) → 3-Tier Flame Impinge Bake (1.2 s) → 7-Pass Ambient Cool Rack (1.2 s) → Auto Count, Bag & Heat Seal (1.2 s) → Retail & Tex-Mex Foodservice.SUPPLIERNixtamalizedMasa & FlourI0.90 d1High-SpeedHydrated Masa MixC/T 1.2 sI1.00 d2Thermal PlatensDual Hot-PressC/T 1.2 sI1.30 d33-Tier FlameImpinge BakeC/T 1.2 sI0.80 d47-Pass AmbientCool RackC/T 1.2 sI0.70 d5Auto Count, Bag &Heat SealC/T 1.2 sI1.20 dCUSTOMERRetail &Tex-Mex…55,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. High-Speed Hydrated Masa Mix1.2 s25 min95%99.0%33,00049,500 (0.90 d)40,363
2. Thermal Platens Dual Hot-Press1.2 s30 min92%98.1%27,50055,000 (1.00 d)37,906
3. 3-Tier Flame Impinge Bake1.2 s45 min85%96.4%44,00071,500 (1.30 d)34,568
4. 7-Pass Ambient Cool Rack1.2 s12 min94%98.6%16,50044,000 (0.80 d)39,854
5. Auto Count, Bag & Heat Seal1.2 s18 min93%99.2%16,50038,500 (0.70 d)38,748

Key figures

Takt time
1.0 s
Lead time
5.90 d
Value-added time
6.0 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
91.6%
Customer demand per day
55,000 packs
Line capacity per day
34,568 packs
Bottleneck
3-Tier Flame Impinge Bake

Reading the bottleneck

The bottleneck is "3-Tier Flame Impinge Bake": it can process 34,568 packs per day against a demand of 55,000 packs, so it falls short of demand by 37.1%. Once downtime and scrap are counted, its cycle time grows from 1.2 s to 1.5 s, against a takt of 1.0 s. The largest loss at this step is equipment downtime (uptime 85%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.