Bottling, Canning & Beverages VSM Scenarios

12 scenarios of Bottling, Canning & Beverages, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.

Shared steps

All 12 scenarios follow the same flow, from supplier to customer: PET Blow / Can Depalletize → Rinser, Filling & Capping → Pasteurizer & Labeling → Shrink Film & Tray Packer → Robot Palletizing & Stretch. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.

Scenario comparison

Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.

ScenarioDemandShiftsTaktLead timePCEBottleneck
18,000 bph PET Bottling Line9,600 packs per day38.4 s8.20 d0.005%Filling & Capping
45,000 cph Aluminum Craft Beer Canning Line14,000 packs per day23.9 s8.20 d0.003%Rotary N2 Purge & Seam
30,000 bph Returnable Glass Soda Line8,200 crates per day39.9 s8.20 d0.006%Empty Bottle Optical EBI
8,000 bph 5L Spring Water PET Combi-Line7,500 packs per day27.2 s8.20 d0.006%Gravity Ultraclean Valve Fill
High-Pressure Pasteurized (HPP) Cold Juice11,000 vials per day24.9 s8.20 d0.004%Nitrogen Headspace PET Fill
Hot-Fill / Aseptic Sport Isotonic Cap Line12,500 packs per day36.5 s8.20 d0.004%Ultra-Clean Sports Cap Torque
60mL Functional Energy & Vitamin Shot Line18,000 packs per day23.0 s8.20 d0.003%24-Head Rotary Micro-Filler
Organic Glass Kombucha Secondary Ferment5,400 packs per day210.0 s8.20 d0.009%Centrifuge & Botanical Spice
Retort Nitro Cold-Brew Aluminum Can Line9,200 packs per day25.9 s8.20 d0.005%Liquid-N2 Doser & Seaming
12,000 bph Winery Bottling, Cork & Capsule4,200 packs per day16.4 s8.20 d0.011%Vacuum Inert Filler & Corker
Automated Stainless 30L Beer Keg Wash & Fill1,400 units per day238.6 s8.20 d0.034%4-Station Acid/Caustic/Steam
High-Value Distilled Spirits Tax-Stamp Line3,600 packs per day215.0 s8.20 d0.013%Level-Sense Gravity Filler