Organic Glass Kombucha Secondary Ferment

Product family: Living Probiotic Bottling.

Flow: Organic Tea & SCOBY → Tea Steep & Tank Ferment → Centrifuge & Botanical Spice → Low-Foam Chilled Bottle Fill → Pressure-Sensitive Kraft Label → Chilled Case & Pallet Wrap → Organic Health Retailers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Organic Glass Kombucha Secondary FermentSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Organic Tea & SCOBY → Tea Steep & Tank Ferment (6.8 s) → Centrifuge & Botanical Spice (10.4 s) → Low-Foam Chilled Bottle Fill (7.6 s) → Pressure-Sensitive Kraft Label (8.0 s) → Chilled Case & Pallet Wrap (6.4 s) → Organic Health Retailers.SUPPLIEROrganic Tea &SCOBYI1.80 d1Tea Steep & TankFermentC/T 6.8 sI1.50 d2Centrifuge &Botanical SpiceC/T 10.4 sI1.40 d3Low-Foam ChilledBottle FillC/T 7.6 sI1.20 d4Pressure-SensitiveKraft LabelC/T 8.0 sI0.80 d5Chilled Case &Pallet WrapC/T 6.4 sI1.50 dCUSTOMEROrganic HealthRetailers5,400 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Tea Steep & Tank Ferment6.8 s45 min92%98.8%6,4809,720 (1.80 d)6,917
2. Centrifuge & Botanical Spice10.4 s65 min84%96.8%6,4808,100 (1.50 d)3,968
3. Low-Foam Chilled Bottle Fill7.6 s25 min92%98.2%3,2407,560 (1.40 d)6,122
4. Pressure-Sensitive Kraft Label8.0 s30 min91%98.5%2,7006,480 (1.20 d)5,647
5. Chilled Case & Pallet Wrap6.4 s10 min96%99.5%1,6204,320 (0.80 d)7,761

Key figures

Takt time
10.0 s
Lead time
8.20 d
Value-added time
39.2 s
Process cycle efficiency (PCE)
0.009%
Rolled throughput yield (RTY)
92.0%
Customer demand per day
5,400 packs
Line capacity per day
3,968 packs
Bottleneck
Centrifuge & Botanical Spice

Reading the bottleneck

The bottleneck is "Centrifuge & Botanical Spice": it can process 3,968 packs per day against a demand of 5,400 packs, so it falls short of demand by 26.5%. Once downtime and scrap are counted, its cycle time grows from 10.4 s to 12.8 s, against a takt of 10.0 s. The largest loss at this step is equipment downtime (uptime 84%), about 2.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.