Retort Nitro Cold-Brew Aluminum Can Line

Product family: 250mL Nitrogenated Coffee.

Flow: Single-Origin Roasters → 16h Cold Extraction Filter → Liquid-N2 Doser & Seaming → Rotary Retort Thermal Steril → Can Air-Dry & Barcode Case → Auto Tray Shrink Wrap → Supermarket & Cafe Chains

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Retort Nitro Cold-Brew Aluminum Can LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Single-Origin Roasters → 16h Cold Extraction Filter (4.0 s) → Liquid-N2 Doser & Seaming (6.1 s) → Rotary Retort Thermal Steril (4.5 s) → Can Air-Dry & Barcode Case (4.7 s) → Auto Tray Shrink Wrap (3.8 s) → Supermarket & Cafe Chains.SUPPLIERSingle-OriginRoastersI1.80 d116h ColdExtraction FilterC/T 4.0 sI1.50 d2Liquid-N2 Doser &SeamingC/T 6.1 sI1.40 d3Rotary RetortThermal SterilC/T 4.5 sI1.20 d4Can Air-Dry &Barcode CaseC/T 4.7 sI0.80 d5Auto Tray ShrinkWrapC/T 3.8 sI1.50 dCUSTOMERSupermarket &Cafe Chains9,200 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 16h Cold Extraction Filter4.0 s45 min92%98.8%11,04016,560 (1.80 d)11,760
2. Liquid-N2 Doser & Seaming6.1 s65 min84%96.8%11,04013,800 (1.50 d)6,765
3. Rotary Retort Thermal Steril4.5 s25 min92%98.2%5,52012,880 (1.40 d)10,339
4. Can Air-Dry & Barcode Case4.7 s30 min91%98.5%4,60011,040 (1.20 d)9,612
5. Auto Tray Shrink Wrap3.8 s10 min96%99.5%2,7607,360 (0.80 d)13,071

Key figures

Takt time
5.9 s
Lead time
8.20 d
Value-added time
23.1 s
Process cycle efficiency (PCE)
0.005%
Rolled throughput yield (RTY)
92.0%
Customer demand per day
9,200 packs
Line capacity per day
6,765 packs
Bottleneck
Liquid-N2 Doser & Seaming

Reading the bottleneck

The bottleneck is "Liquid-N2 Doser & Seaming": it can process 6,765 packs per day against a demand of 9,200 packs, so it falls short of demand by 26.5%. Once downtime and scrap are counted, its cycle time grows from 6.1 s to 7.5 s, against a takt of 5.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 1.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Bottling, Canning & Beverages: Bottling, Canning & Beverages