Automated Stainless 30L Beer Keg Wash & Fill

Product family: Returnable Brewery Kegs.

Flow: Pub & Taproom Keg Return → De-Cap & External Pressure Wash → 4-Station Acid/Caustic/Steam → Counter-Pressure CO2 Keg Fill → Seal-Cap & Ultrasonic Weight → RFID Scan & 6-Keg Pallet → Regional Pubs & Bars

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Automated Stainless 30L Beer Keg Wash & FillSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Pub & Taproom Keg Return → De-Cap & External Pressure Wash (26.2 s) → 4-Station Acid/Caustic/Steam (40.0 s) → Counter-Pressure CO2 Keg Fill (29.3 s) → Seal-Cap & Ultrasonic Weight (30.9 s) → RFID Scan & 6-Keg Pallet (24.7 s) → Regional Pubs & Bars.SUPPLIERPub & TaproomKeg ReturnI1.80 d1De-Cap & ExternalPressure WashC/T 26.2 sI1.50 d24-StationAcid/Caustic/SteamC/T 40.0 sI1.40 d3Counter-PressureCO2 Keg FillC/T 29.3 sI1.20 d4Seal-Cap &Ultrasonic WeightC/T 30.9 sI0.80 d5RFID Scan & 6-KegPalletC/T 24.7 sI1.50 dCUSTOMERRegional Pubs &Bars1,400 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. De-Cap & External Pressure Wash26.2 s45 min92%98.8%1,6802,520 (1.80 d)1,795
2. 4-Station Acid/Caustic/Steam40.0 s65 min84%96.8%1,6802,100 (1.50 d)1,032
3. Counter-Pressure CO2 Keg Fill29.3 s25 min92%98.2%8401,960 (1.40 d)1,588
4. Seal-Cap & Ultrasonic Weight30.9 s30 min91%98.5%7001,680 (1.20 d)1,462
5. RFID Scan & 6-Keg Pallet24.7 s10 min96%99.5%4201,120 (0.80 d)2,011

Key figures

Takt time
38.6 s
Lead time
8.20 d
Value-added time
151 s
Process cycle efficiency (PCE)
0.034%
Rolled throughput yield (RTY)
92.0%
Customer demand per day
1,400 units
Line capacity per day
1,032 units
Bottleneck
4-Station Acid/Caustic/Steam

Reading the bottleneck

The bottleneck is "4-Station Acid/Caustic/Steam": it can process 1,032 units per day against a demand of 1,400 units, so it falls short of demand by 26.3%. Once downtime and scrap are counted, its cycle time grows from 40.0 s to 49.2 s, against a takt of 38.6 s. The largest loss at this step is equipment downtime (uptime 84%), about 7.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Bottling, Canning & Beverages: Bottling, Canning & Beverages