8,000 bph 5L Spring Water PET Combi-Line
Product family: 5-Liter Family Water Jugs.
Flow: Aquifers & Preform Plants → 5L Handle Ring Orient & Blow → Gravity Ultraclean Valve Fill → Press-On Handle Applicator → Wrap-Around Label & Coding → 2-Pack Shrink & Tier Pallet → Hypermarket Wholesale
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. 5L Handle Ring Orient & Blow | 4.9 s | 45 min | 92% | 98.8% | 9,000 | 13,500 (1.80 d) | 9,600 |
| 2. Gravity Ultraclean Valve Fill | 7.5 s | 65 min | 84% | 96.8% | 9,000 | 11,250 (1.50 d) | 5,502 |
| 3. Press-On Handle Applicator | 5.5 s | 25 min | 92% | 98.2% | 4,500 | 10,500 (1.40 d) | 8,459 |
| 4. Wrap-Around Label & Coding | 5.8 s | 30 min | 91% | 98.5% | 3,750 | 9,000 (1.20 d) | 7,789 |
| 5. 2-Pack Shrink & Tier Pallet | 4.6 s | 10 min | 96% | 99.5% | 2,250 | 6,000 (0.80 d) | 10,798 |
Key figures
- Takt time
- 7.2 s
- Lead time
- 8.20 d
- Value-added time
- 28.3 s
- Process cycle efficiency (PCE)
- 0.006%
- Rolled throughput yield (RTY)
- 92.0%
- Customer demand per day
- 7,500 packs
- Line capacity per day
- 5,502 packs
- Bottleneck
- Gravity Ultraclean Valve Fill
Reading the bottleneck
The bottleneck is "Gravity Ultraclean Valve Fill": it can process 5,502 packs per day against a demand of 7,500 packs, so it falls short of demand by 26.6%. Once downtime and scrap are counted, its cycle time grows from 7.5 s to 9.2 s, against a takt of 7.2 s. The largest loss at this step is equipment downtime (uptime 84%), about 1.4 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Bottling, Canning & Beverages: Bottling, Canning & Beverages
- 18,000 bph PET Bottling Line
- 45,000 cph Aluminum Craft Beer Canning Line
- 30,000 bph Returnable Glass Soda Line
- High-Pressure Pasteurized (HPP) Cold Juice
- Hot-Fill / Aseptic Sport Isotonic Cap Line
- 60mL Functional Energy & Vitamin Shot Line
- Organic Glass Kombucha Secondary Ferment
- Retort Nitro Cold-Brew Aluminum Can Line
- 12,000 bph Winery Bottling, Cork & Capsule
- Automated Stainless 30L Beer Keg Wash & Fill
- High-Value Distilled Spirits Tax-Stamp Line