Dairy, UHT & Plant-Based Alt VSM Scenarios
12 scenarios of Dairy, UHT & Plant-Based Alt, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Raw Reception & Standardize → Homogenize & Flavor Blend → UHT Sterilizer & CIP Cycles → Aseptic Brick / Cup Fill → Tray Pack & Cold Store (+4°C). What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| UHT Aseptic Dairy Processing & Filling | 8,000 packs per day | 2 | 6.8 s | 7.20 d | 0.007% | UHT Sterilizer & CIP Cycles |
| Ultrafiltered Stirred Greek Yogurt Cup Line | 24,000 packs per day | 3 | 3.4 s | 7.20 d | 0.002% | Thermoform FFS Cup & Fruit Mix |
| Continuous Pasta-Filata Mozzarella Shred & Ball | 6,500 packs per day | 2 | 8.3 s | 7.20 d | 0.009% | Chilled Salt-Brine Tunnel |
| Enzymatic Oat Hydrolysis UHT Plant-Milk Line | 9,500 packs per day | 2 | 5.7 s | 7.20 d | 0.006% | Oil Emulsion & UHT Steam Inj |
| GMP Stage-1 Spray-Dried Infant Formula Can Line | 14,000 packs per day | 3 | 5.8 s | 7.20 d | 0.004% | Double-Seam Vacuum Gas Can |
| Rotary Extruded Chocolate-Dipped Ice Cream Bar | 22,000 packs per day | 2 | 2.5 s | 7.20 d | 0.003% | -38°C Hardening Liquid N2 |
| Microfiltered Whey Isolate (WPI) Pouch & Tub Line | 7,200 packs per day | 2 | 7.5 s | 7.20 d | 0.008% | Servo Auger Dose & Scoop |
| Continuous Churn Cultured Butter Parchment Wrap | 18,000 packs per day | 2 | 3.0 s | 7.20 d | 0.003% | 80-bpm Foil Parchment Wrap |
| Traditional Soft Surface-Ripened Cheese Flow | 9,000 packs per day | 2 | 6.0 s | 7.20 d | 0.006% | 12-Day Humidity Cellar Affinage |
| Live 12-Strain Cultured Kefir PET Bottle | 11,500 packs per day | 2 | 4.7 s | 7.20 d | 0.005% | Clean-Fill PET Effervesce Cap |
| Vacuum Evaporated Sweetened Condensed Milk Can | 24,000 packs per day | 3 | 3.4 s | 7.20 d | 0.002% | High-Speed Rotary Seamer |
| Coconut-Starch Plant-Based Sliced Cheese Line | 13,000 packs per day | 2 | 4.2 s | 7.20 d | 0.004% | High-Speed Orbital Log Slicer |