Ultrafiltered Stirred Greek Yogurt Cup Line

Product family: 4x125g Multipack Cups.

Flow: Dairy Co-op Raw Milk → UF Membrane Protein Concent → 5-Hour Vat Acid Ferment → Thermoform FFS Cup & Fruit Mix → Foil Heat-Seal & Snap Multi → Spiral Chiller to +4°C Dock → Chilled Grocery Chains

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Ultrafiltered Stirred Greek Yogurt Cup LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Dairy Co-op Raw Milk → UF Membrane Protein Concent (2.2 s) → 5-Hour Vat Acid Ferment (2.7 s) → Thermoform FFS Cup & Fruit Mix (3.6 s) → Foil Heat-Seal & Snap Multi (2.8 s) → Spiral Chiller to +4°C Dock (2.1 s) → Chilled Grocery Chains.SUPPLIERDairy Co-op RawMilkI1.20 d1UF MembraneProtein ConcentC/T 2.2 sI1.10 d25-Hour Vat AcidFermentC/T 2.7 sI1.50 d3Thermoform FFSCup & Fruit MixC/T 3.6 sI0.90 d4Foil Heat-Seal &Snap MultiC/T 2.8 sI1.10 d5Spiral Chiller to+4°C DockC/T 2.1 sI1.40 dCUSTOMERChilled GroceryChains24,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. UF Membrane Protein Concent2.2 s25 min95%99.1%24,00028,800 (1.20 d)34,021
2. 5-Hour Vat Acid Ferment2.7 s35 min92%98.4%19,20026,400 (1.10 d)26,278
3. Thermoform FFS Cup & Fruit Mix3.6 s85 min81%97.5%24,00036,000 (1.50 d)16,651
4. Foil Heat-Seal & Snap Multi2.8 s30 min90%97.9%12,00021,600 (0.90 d)24,356
5. Spiral Chiller to +4°C Dock2.1 s12 min96%99.4%9,60026,400 (1.10 d)35,988

Key figures

Takt time
3.4 s
Lead time
7.20 d
Value-added time
13.4 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
92.5%
Customer demand per day
24,000 packs
Line capacity per day
16,651 packs
Bottleneck
Thermoform FFS Cup & Fruit Mix

Reading the bottleneck

The bottleneck is "Thermoform FFS Cup & Fruit Mix": it can process 16,651 packs per day against a demand of 24,000 packs, so it falls short of demand by 30.6%. Once downtime and scrap are counted, its cycle time grows from 3.6 s to 4.6 s, against a takt of 3.4 s. The largest loss at this step is equipment downtime (uptime 81%), about 0.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.