GMP Stage-1 Spray-Dried Infant Formula Can Line

Product family: 800g Nitrogen-Flushed Tins.

Flow: Lactose, WPC & DHA Oils → Dry Blend Micro-Vitamins → High-Tower Spray Drying → Double-Seam Vacuum Gas Can → Scoop Drop & Tamper Overcap → Hold Release Cronobacter QC → Pharmacies & Export Markets

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: GMP Stage-1 Spray-Dried Infant Formula Can LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Lactose, WPC & DHA Oils → Dry Blend Micro-Vitamins (3.8 s) → High-Tower Spray Drying (4.6 s) → Double-Seam Vacuum Gas Can (6.2 s) → Scoop Drop & Tamper Overcap (4.9 s) → Hold Release Cronobacter QC (3.6 s) → Pharmacies & Export Markets.SUPPLIERLactose, WPC &DHA OilsI1.20 d1Dry BlendMicro-VitaminsC/T 3.8 sI1.10 d2High-Tower SprayDryingC/T 4.6 sI1.50 d3Double-SeamVacuum Gas CanC/T 6.2 sI0.90 d4Scoop Drop &Tamper OvercapC/T 4.9 sI1.10 d5Hold ReleaseCronobacter QCC/T 3.6 sI1.40 dCUSTOMERPharmacies &Export Markets14,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Dry Blend Micro-Vitamins3.8 s25 min95%99.1%14,00016,800 (1.20 d)19,696
2. High-Tower Spray Drying4.6 s35 min92%98.4%11,20015,400 (1.10 d)15,424
3. Double-Seam Vacuum Gas Can6.2 s85 min81%97.5%14,00021,000 (1.50 d)9,668
4. Scoop Drop & Tamper Overcap4.9 s30 min90%97.9%7,00012,600 (0.90 d)13,918
5. Hold Release Cronobacter QC3.6 s12 min96%99.4%5,60015,400 (1.10 d)20,993

Key figures

Takt time
5.8 s
Lead time
7.20 d
Value-added time
23.1 s
Process cycle efficiency (PCE)
0.004%
Rolled throughput yield (RTY)
92.5%
Customer demand per day
14,000 packs
Line capacity per day
9,668 packs
Bottleneck
Double-Seam Vacuum Gas Can

Reading the bottleneck

The bottleneck is "Double-Seam Vacuum Gas Can": it can process 9,668 packs per day against a demand of 14,000 packs, so it falls short of demand by 30.9%. Once downtime and scrap are counted, its cycle time grows from 6.2 s to 7.9 s, against a takt of 5.8 s. The largest loss at this step is equipment downtime (uptime 81%), about 1.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.