Vacuum Evaporated Sweetened Condensed Milk Can

Product family: 397g Easy-Open Steel Cans.

Flow: Sucrose & Concentrated Milk → Multi-Effect Falling-Film Evap → Vacuum Crystallizer Smooth → High-Speed Rotary Seamer → Can Washer & Wrap Label → Tray Heat-Shrink Pack → Global Retail & Bakeries

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Vacuum Evaporated Sweetened Condensed Milk CanSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Sucrose & Concentrated Milk → Multi-Effect Falling-Film Evap (2.2 s) → Vacuum Crystallizer Smooth (2.7 s) → High-Speed Rotary Seamer (3.6 s) → Can Washer & Wrap Label (2.8 s) → Tray Heat-Shrink Pack (2.1 s) → Global Retail & Bakeries.SUPPLIERSucrose &ConcentratedMilkI1.20 d1Multi-EffectFalling-Film EvapC/T 2.2 sI1.10 d2VacuumCrystallizer…C/T 2.7 sI1.50 d3High-Speed RotarySeamerC/T 3.6 sI0.90 d4Can Washer & WrapLabelC/T 2.8 sI1.10 d5Tray Heat-ShrinkPackC/T 2.1 sI1.40 dCUSTOMERGlobal Retail &Bakeries24,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Multi-Effect Falling-Film Evap2.2 s25 min95%99.1%24,00028,800 (1.20 d)34,021
2. Vacuum Crystallizer Smooth2.7 s35 min92%98.4%19,20026,400 (1.10 d)26,278
3. High-Speed Rotary Seamer3.6 s85 min81%97.5%24,00036,000 (1.50 d)16,651
4. Can Washer & Wrap Label2.8 s30 min90%97.9%12,00021,600 (0.90 d)24,356
5. Tray Heat-Shrink Pack2.1 s12 min96%99.4%9,60026,400 (1.10 d)35,988

Key figures

Takt time
3.4 s
Lead time
7.20 d
Value-added time
13.4 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
92.5%
Customer demand per day
24,000 packs
Line capacity per day
16,651 packs
Bottleneck
High-Speed Rotary Seamer

Reading the bottleneck

The bottleneck is "High-Speed Rotary Seamer": it can process 16,651 packs per day against a demand of 24,000 packs, so it falls short of demand by 30.6%. Once downtime and scrap are counted, its cycle time grows from 3.6 s to 4.6 s, against a takt of 3.4 s. The largest loss at this step is equipment downtime (uptime 81%), about 0.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.